# Storage shed land development, Herndon Borough

Herndon Borough, PA · warehouse & storage · 5.6 acres

In short: **Storage shed land development, Herndon Borough** is a warehouse and storage development in Herndon Borough, Northumberland County, PA. The site is 5.6 acres. As of November 24, 2026, it is in review. Latest record: Final land development filed for county review (December 12, 2024). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Final land development filed for county review · Dec 12, 2024 · [source](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

Final land development for a storage shed at Herndon Reload Company in Herndon Borough, on about 5.57 acres. The agenda does not give the building size.

- **Applicant:** [Herndon Reload Company](https://plannednearby.com/f/herndon-reload-co)
- **Engineer / designer:** Cole Boyer, P.E.
- **Plan type:** Final land development
- **Land use:** warehouse

## Project history

- **2024-12-12** · #125-012 · Final land development

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3)

Map pin is approximate.

## The full picture AI research · Nov 15, 2026

A final land development plan was filed with the county for a storage shed at Herndon Reload Company in Herndon Borough. The site is about 5.57 acres. The county agenda does not give the building's size.

The company's own website describes a working rail-served reload and warehousing operation, a wood-products plant, and a bedding operation at its Pennsylvania Avenue site. A 2023 trade-magazine profile says the company started in 2005 on a former factory site with a surrounding tract of about 25 acres, with a rail siding and several warehouses. The new shed would most likely add storage space to that existing operation. That reading is an inference, because no document describing the shed itself was found.

No news coverage, borough meeting minutes, permits or opening notices for the shed turned up online.

### What it could mean nearby

- The shed would sit on an existing industrial site that already handles rail and truck freight, so it may not add a new kind of activity. No traffic study was found.
- The company reportedly employs roughly 25 to 30 people. No source says the shed would add jobs.

### Where it stands

County records show the final land development plan was filed for county review on 2024-12-12, and no later approval, permit or construction record was found. After county and borough review, a plan like this usually needs borough approval, then building permits, before construction starts.

- **Dec 12, 2024** Final land development for the storage shed filed for county review

### Who's behind it

[Herndon Reload Company](https://www.herndonreload.com/) · A Herndon, PA company that runs a rail-served reload and warehousing business and makes wood bed-foundation parts and animal bedding.

### Around the web

- [Northumberland County planning commission agenda feed](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3) — Northumberland County, PA · Dec 12, 2024This feed is the county record for the filing. It lists planning commission agendas but gave no building size.
- [Herndon Reload – Manufacturing and Transport Professionals](https://www.herndonreload.com/) — Herndon Reload CompanyThe company's site describes its reload, warehousing, manufacturing and bedding services and says nothing about a new shed.
- [Herndon Reload's Success Story](https://bedtimesmagazine.com/2023/10/herndon-reloads-success-story/) — BedTimes Magazine · Oct 1, 2023The article gives the company's history, its rail siding and warehouses, a 25-acre tract, and roughly 25 to 30 employees.

Planning terms explained

- **Final land development:** The last detailed plan stage, showing a building, parking, drainage and utilities for review before approval.
- **Reload facility:** A site where freight is moved between rail cars and trucks and often stored in between.
- **Acre:** A unit of land area, a little smaller than a football field including the end zones.

Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** Herndon Borough and the Northumberland County planning commission review land development plans, so residents can ask them about comment opportunities at their public meetings.

In Pennsylvania, Herndon Borough decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Herndon Borough planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Herndon Borough manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Herndon Borough's meeting agendas →](https://www.google.com/search?q=Herndon+Borough+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [8-acre solar project, Herndon Borough](https://plannednearby.com/x/northumberland-8-acre-solar-project-herndon-borough-b439ee) — same area · other · Herndon Borough · filed 2026-07-10
- [Final minor subdivision and land development, Jackson](https://plannednearby.com/x/northumberland-final-minor-subdivision-and-land-develop-da5030) — same area · lot line change · Jackson Township · filed 2026-07-22
- [Pivot PAL 055 land development, Jackson Twp.](https://plannednearby.com/x/northumberland-725-073) — same area · other · Jackson Township · filed 2025-03-14
- [Herndon Reload Co. storage shed, 5.57 acres](https://plannednearby.com/x/northumberland-225-020) — same area · warehouse & storage · Herndon Borough · filed 2024-12-12
- [11,680 SF storage shed, Jackson Township](https://plannednearby.com/x/northumberland-11-680-sf-storage-shed-jackson-township-49036f) — same area · 11,680 sq ft non-residential, warehouse & storage · Jackson Township · filed 2026-05-14
- [Storage shed land development, Herndon Borough](https://plannednearby.com/x/northumberland-1224-117) — same area · warehouse & storage · Herndon Borough · filed 2024-12-17

[See everything nearby on a map →](https://plannednearby.com/near#40.70160,-76.85026,Herndon%20Borough)

---

Source page: https://plannednearby.com/x/northumberland-125-012

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.