[Northumberland County](https://plannednearby.com/c/northumberland-pa/) · [Herndon Borough](https://plannednearby.com/c/northumberland-pa/herndon-borough) · #225-020

# Herndon Reload Co. storage shed, 5.57 acres

Herndon Borough, PA · warehouse & storage · 5.6 acres

In short: **Herndon Reload Co. storage shed, 5.57 acres** is a warehouse and storage development in Herndon Borough, Northumberland County, PA. The site is 5.6 acres. As of November 24, 2026, it is in review. Latest record: Final land development filed for county review (December 12, 2024). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Final land development filed for county review · Dec 12, 2024 · [source](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

A final land development plan for a storage shed by Herndon Reload Company on a 5.57-acre site in Herndon Borough. The plan was tabled at the January 28, 2025 meeting.

- **Engineer / designer:** Cole Boyer, P.E.
- **Plan type:** Final land development
- **Land use:** other

## Project history

- **2024-12-12** · #225-020 · Final land development

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3)

Map pin is approximate.

## The full picture AI research · Nov 15, 2026

Herndon Reload Company has filed a final land development plan to build a storage shed on a 5.57-acre site in Herndon Borough, Northumberland County. The county summary says the plan was tabled at the January 28, 2025 meeting. Tabled means the board set it aside without deciding.

The company already runs a rail reload and storage operation in the borough. A state air permit lists it at 386 Pennsylvania Avenue, but no source confirms the shed site is at that address. The shed's size, what it will store and its exact location were not found.

No news coverage, opposition, builder page, listing, construction notice or stormwater permit for the shed turned up online. Nothing found shows work has started.

### What it could mean nearby

- The shed would expand an existing rail-related business in the borough. No source gives any change in truck traffic or jobs.
- No source describes new homes, school effects or utility needs. The use is a warehouse and storage building, not housing.

### Where it stands

The county shows the final land development plan filed on 2024-12-12 and tabled on 2025-01-28, so it is still in review. A tabled plan usually returns once the applicant or reviewers resolve open questions. After that, local approval, stormwater and building permits normally follow.

- **Jan 28, 2025** Plan tabled at the meeting, per the county summary
- **Dec 12, 2024** Final land development plan filed for county review
- **Sep 18, 2023** State air-quality operating permit issued for the company's existing Herndon plant

### Who's behind it

Herndon Reload Company · A Herndon, PA company that a trade magazine profile describes as a rail reload (transfer) facility founded in 2005 by local investors. The same profile says it also makes wood bed components.

### Around the web

- [Northumberland County planning commission agenda feed](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3) — Northumberland County, PA · Dec 12, 2024Lists the county's Planning Commission agenda and minutes posts, including the filing of this plan. The feed text did not include the plan's details.
- [State Only Synthetic Minor Operating Permit 49-00059](https://files.dep.state.pa.us/air/AirQuality/AQPortalFiles/Permits/PermitDocuments/1424903[49-00059]_Issued_v1.pdf) — Pennsylvania DEP · Sep 18, 2023Shows Herndon Reload Co. operates an existing plant at 386 Pennsylvania Ave, Herndon.
- [Strong Build, Smart Storage](https://bedtimesmagazine.com/?p=141162) — Bedtimes MagazineProfiles Herndon Reload as a rail reload business founded in 2005 that also makes wood bed components.

Planning terms explained

- **Final land development plan:** The detailed site plan a landowner submits for a new building, showing layout, drainage and access, for formal approval.
- **Tabled:** A board set the item aside without approving or denying it, so it can come back later.
- **Reload facility:** A site where goods are moved between trucks and rail cars.
- **Stormwater permit:** State approval for how rain runoff is handled when ground is disturbed during construction.

Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Northumberland County Planning Commission reviewed the plan, and Herndon Borough also acts on land development plans. Comments can go through the county planning office or the borough's public meetings. No hearing date was found.

In Pennsylvania, Herndon Borough decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Herndon Borough planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Herndon Borough manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Herndon Borough's meeting agendas →](https://www.google.com/search?q=Herndon+Borough+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Final minor subdivision and land development, Jackson](https://plannednearby.com/x/northumberland-final-minor-subdivision-and-land-develop-da5030) — same area · lot line change · Jackson Township · filed 2026-07-22
- [Pivot PAL 055 land development, Jackson Twp.](https://plannednearby.com/x/northumberland-725-073) — same area · other · Jackson Township · filed 2025-03-14
- [Storage shed land development, Herndon Borough](https://plannednearby.com/x/northumberland-125-012) — same area · warehouse & storage · Herndon Borough · filed 2024-12-12
- [8-acre solar project, Herndon Borough](https://plannednearby.com/x/northumberland-8-acre-solar-project-herndon-borough-b439ee) — same area · other · Herndon Borough · filed 2026-07-10
- [36.02-acre land development, Jackson Township](https://plannednearby.com/x/northumberland-36-02-acre-land-development-jackson-town-15252c) — same area · other · Jackson Township · filed 2025-11-19
- [11,680 SF storage shed, Jackson Township](https://plannednearby.com/x/northumberland-11-680-sf-storage-shed-jackson-township-49036f) — same area · 11,680 sq ft non-residential, warehouse & storage · Jackson Township · filed 2026-05-14

[See everything nearby on a map →](https://plannednearby.com/near#40.70347,-76.84833,Herndon%20Borough)

---

Source page: https://plannednearby.com/x/northumberland-225-020

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
