[Northumberland County](https://plannednearby.com/c/northumberland-pa/) · [Point Township](https://plannednearby.com/c/northumberland-pa/point-township) · #2026-08-3-274-acre-final-add-on-subdivision-poin

# 3.274-acre final add-on subdivision, Point Township

Point Township, PA · lot line change · 3.3 acres

In short: **3.274-acre final add-on subdivision, Point Township** is a lot line change in Point Township, Northumberland County, PA. The site is 3.3 acres. As of November 24, 2026, it is in review. Latest record: Final add-on subdivision filed for county review (August 12, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Final add-on subdivision filed for county review · Aug 12, 2026 · [source](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=1)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

A final add-on subdivision covering 3.274 acres in Point Township, submitted by H&G Realty Development, LLC. The agenda does not describe the change to the lots or existing site conditions.

- **Applicant:** [H&G Realty Development, LLC](https://plannednearby.com/f/h-g-realty-development-llc)
- **Engineer / designer:** [Mid-Penn Engineering Corp.](https://plannednearby.com/f/mid-penn-engineering-corporation)
- **Plan type:** Final add-on subdivision
- **Land use:** lot-line-change

## Project history

- **2026-08-12** · #2026-08-3-274-acre-final-add-on-subdivision-poin · Final add-on subdivision

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=1)

Map pin is approximate.

## The full picture AI research · Nov 8, 2026

A company called H&G Realty Development, LLC has asked Northumberland County to review a plan to change property lines on about 3.3 acres in Point Township. An "add-on" subdivision usually moves land from one parcel to a neighboring one. It does not usually create new building lots.

The county agenda does not say which lots are involved or what is on the land now. The county lists the type as a lot line change, and nothing found shows any homes or buildings being proposed.

No developer website, news coverage, listings, construction notices or permits were found for this site. The only public record found is the county Planning Commission's August 25, 2026 agenda, which lists the plan. A set of minutes for that meeting is posted, but its text could not be read, so the outcome is unconfirmed.

### What it could mean nearby

- A lot line change on its own normally adds no homes and little or no traffic.
- The records do not say whether any building or new use is planned on the land, so any effect on neighbors is unknown.

### Where it stands

The county shows the final add-on subdivision as under review, with the latest filing on 2026-08-12 and the plan listed on the Planning Commission's 2026-08-25 agenda. The county's decision on the plan could not be read, so the outcome is not confirmed. After county review, a township's own approval or recording of the revised lot lines usually follows.

- **Aug 25, 2026** Plan listed on the county Planning Commission agenda
- **Aug 12, 2026** Final add-on subdivision filed for county review

### Who's behind it

H&G Realty Development, LLC · No public information about the company's website or other projects was found; Mid-Penn Engineering Corp. is the firm named on the filing.

### Around the web

- [2026 08 25 planning agenda](https://www.northumberlandcountypa.gov/htdocs/wp-content/uploads/documents/planning/2026_08_25_planning_ada.pdf) — Northumberland County, PA · Aug 25, 2026Lists the Point Township 3.274-acre final add-on subdivision for H&G Realty Development, LLC.
- [2026 08 25 planning minutes](https://www.northumberlandcountypa.gov/htdocs/wp-content/uploads/documents/planning/2026_08_25_planning_minutes_ada.pdf) — Northumberland County, PA · Aug 25, 2026Minutes for the meeting are posted, but their text could not be read, so the outcome is unconfirmed.

Planning terms explained

- **Add-on subdivision:** A change that moves land from one parcel to a neighboring parcel, usually without creating a new lot.
- **Lot line change:** An adjustment to the boundary between existing properties.
- **Final plan:** The last detailed version of a subdivision plan submitted for approval.
- **Planning Commission:** A public board that reviews development plans and advises or decides under local rules.

Researched by AI from public sources on Nov 8, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Northumberland County Planning Commission reviews the plan at public meetings at the county Administration Center in Sunbury, and residents can also raise concerns with the Point Township supervisors.

In Pennsylvania, Point Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Point Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Point Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Point Township's meeting agendas →](https://www.google.com/search?q=Point+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Furman Farms final subdivision consolidation](https://plannednearby.com/x/northumberland-1025-099) — same area · lot line change · Point Township · filed 2025-09-23
- [Grace Bible Fellowship Church land development, Point Twp](https://plannednearby.com/x/northumberland-grace-bible-fellowship-church-land-devel-7d866f) — same area · institutional · Point Township · filed 2026-07-07
- [0.5-acre final add-on subdivision in Point Township](https://plannednearby.com/x/northumberland-325-026) — same area · lot line change · Point Township · filed 2025-03-20
- [75.44-acre final land development, Point Township](https://plannednearby.com/x/northumberland-75-44-acre-final-land-development-point-49459c) — same area · other · Point Township · filed 2026-08-04
- [Furman Farms 157-acre final minor subdivision & consolidation](https://plannednearby.com/x/northumberland-furman-farms-157-acre-final-minor-subdiv-b56ae7) — same area · agricultural · Point Township · filed 2026-10-06
- [Ridge Point Farms minor subdivision, Point Twp](https://plannednearby.com/x/northumberland-ridge-point-farms-minor-subdivision-poin-baa495) — same area · agricultural · Point Township · filed 2026-05-20

[See everything nearby on a map →](https://plannednearby.com/near#40.90839,-76.80213,Point%20Township)

---

Source page: https://plannednearby.com/x/northumberland-3-274-acre-final-add-on-subdivision-poin-975d74

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
