[Northumberland County](https://plannednearby.com/c/northumberland-pa/) · [Herndon Borough](https://plannednearby.com/c/northumberland-pa/herndon-borough) · #325-027

# Herndon Reload Company storage shed land development

Herndon Borough, PA · warehouse & storage · 5.6 acres

In short: **Herndon Reload Company storage shed land development** is a warehouse and storage development in Herndon Borough, Northumberland County, PA. The site is 5.6 acres. As of November 24, 2026, it is in review. Latest record: Final land development filed for county review (December 12, 2024). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Final land development filed for county review · Dec 12, 2024 · [source](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

Final land development for a storage shed by Herndon Reload Company on 5.57 acres in Herndon Borough. The agenda does not give the shed size or other site details.

- **Applicant:** [Herndon Reload Company](https://plannednearby.com/f/herndon-reload-co)
- **Engineer / designer:** Cole Boyer, P.E.
- **Plan type:** Final land development
- **Land use:** other

## Project history

- **2024-12-12** · #325-027 · Final land development

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2)

Map pin is approximate.

## The full picture AI research · Nov 15, 2026

Herndon Reload Company has filed a final land development plan for a storage shed on 5.57 acres in Herndon Borough, Northumberland County. The county agenda gives no shed size, address or other site details, so how big the building will be is unknown.

Herndon Reload is an existing business in the borough. A 2023 magazine profile describes it as a rail freight reload and wood-products company. It was founded in 2005 and sits on the Norfolk Southern main line. It handles lumber and other goods, makes bed foundation components and pallets, and employs about 25 to 30 people. The shed is probably linked to that operation, but no source says so directly.

No news, builder page, listing or permit was found showing that construction has started or finished. The county filing is the latest record found.

### What it could mean nearby

- Truck traffic could change if the shed supports the existing rail reload and wood operations, but no traffic details were found.
- The business already employs about 25 to 30 people. No source says the shed will add jobs.
- The shed's size, stormwater plans and utilities are not in the records found.

### Where it stands

The final land development plan was filed for county review on 2024-12-12, and no later approval, permit or construction record was found. The usual next steps are county comments, a decision by the borough, and then building and stormwater permits.

- **Dec 12, 2024** Final land development plan for the storage shed filed for county review
- **Oct 2023** Magazine profile describes the company's rail reload and wood-products operations
- **Sep 18, 2023** PA DEP issued an air-quality operating permit for the existing Herndon Reload plant

### Who's behind it

Herndon Reload Company · A Herndon, PA company founded in 2005 that offers rail freight reload and storage and makes wood bed-foundation components, pallets and lumber products.

### Around the web

- [Northumberland County planning commission agenda feed](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2) — Northumberland County, PA · Dec 12, 2024County record of the final land development filing. The page text read here did not mention the project, so the filing detail comes from the county facts supplied.
- [Herndon Reload's success story](https://bedtimesmagazine.com/2023/10/herndon-reloads-success-story/) — Bedtimes Magazine · Oct 1, 2023Describes the company's rail reload, storage and wood-products operations in Herndon and its 25 to 30 employees. It mentions no new shed.
- [Air permit 49-00059 for Herndon Reload Co](https://files.dep.state.pa.us/air/AirQuality/AQPortalFiles/Permits/PermitDocuments/1424903[49-00059]_Issued_v1.pdf) — PA Department of Environmental Protection · Sep 18, 2023Shows the company has an existing plant in Herndon with a state air-quality operating permit. It covers existing operations, not a new shed.

Planning terms explained

- **Final land development plan:** The detailed site plan a municipality reviews before approving construction of a new building or major site change.
- **Reload facility:** A site where goods are moved between rail cars and trucks.
- **Stormwater permit:** A state-regulated approval covering how rain runoff from a construction site is managed.

Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Herndon Borough governing body and planning body decide on local land development approval, and residents can contact the borough office or attend its public meetings. The county planning commission also reviews the plan.

In Pennsylvania, Herndon Borough decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Herndon Borough planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Herndon Borough manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Herndon Borough's meeting agendas →](https://www.google.com/search?q=Herndon+Borough+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Herndon Reload Solar Project, 8.0 LOD](https://plannednearby.com/x/northumberland-herndon-reload-solar-project-8-0-lod-b439ee) — same area · other · Herndon Borough · filed 2026-07-10
- [Pivot PAL 055 land development, Jackson Twp](https://plannednearby.com/x/northumberland-525-046) — same area · other · Jackson Township · filed 2025-03-14
- [Northumberland Solar 1 land development, Jackson Twp](https://plannednearby.com/x/northumberland-924-088) — same area · subdivision (use not stated) · Jackson Township · filed 2024-08-19
- [Storage shed land development, Jackson Township](https://plannednearby.com/x/northumberland-storage-shed-land-development-jackson-to-49036f) — same area · warehouse & storage · Jackson Township · filed 2026-05-14
- [Herndon Reload storage shed land development](https://plannednearby.com/x/northumberland-425-036) — same area · warehouse & storage · Herndon Borough · filed 2024-12-12
- [8.0-acre solar project, Herndon Borough](https://plannednearby.com/x/northumberland-2026-08-8-0-acre-solar-project-herndon-borough) — same area · other · Herndon Borough · filed 2026-07-10

[See everything nearby on a map →](https://plannednearby.com/near#40.71347,-76.84945,Herndon%20Borough)

---

Source page: https://plannednearby.com/x/northumberland-325-027

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
