[Northumberland County](https://plannednearby.com/c/northumberland-pa/) · [Kulpmont Borough](https://plannednearby.com/c/northumberland-pa/kulpmont-borough) · #2026-02-4-8-acre-land-development-kulpmont-borou

# 4.8-acre land development, Kulpmont Borough

Kulpmont Borough, PA · other · 4.8 acres

In short: **4.8-acre land development, Kulpmont Borough** is a development project in Kulpmont Borough, Northumberland County, PA. The site is 4.8 acres. As of November 24, 2026, it is in review. Latest record: Preliminary/final land development filed for county review (May 28, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Preliminary/final land development filed for county review · May 28, 2025 · [source](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=1)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

The agenda lists a combined preliminary and final land development of 4.8 acres in Kulpmont Borough by Freedom 40 LLC, submitted May 28, 2025. The agenda does not describe what will be built.

- **Applicant:** [Freedom 40 LLC](https://plannednearby.com/f/freedom-40-llc)
- **Engineer / designer:** [FWH Associates](https://plannednearby.com/f/fwh-associates-p-a)
- **Plan type:** Preliminary/final land development
- **Land use:** other

## Project history

- **2025-05-28** · #2026-02-4-8-acre-land-development-kulpmont-borou · Preliminary/final land development
- **2025-05-28** · #2026-03-4-8-acre-land-development-kulpmont-borou · Preliminary/final land development

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=1)

Map pin is approximate.

## The full picture AI research · Nov 8, 2026

County records show a combined preliminary and final land development plan for a 4.8-acre site in Kulpmont Borough, Northumberland County. The developer is Freedom 40 LLC. The firm FWH Associates is also named on the filing, which was submitted on May 28, 2025.

The county agenda does not say what will be built, so the use is unknown. The searches found no developer website, news story, borough minutes, listing, business listing or permit record for this project. They also found nothing on whether the site has been cleared, built on or occupied.

Some unrelated Kulpmont construction bids turned up, including a laboratory facility and a recycling building. Nothing links them to this filing, so they are not used here.

### What it could mean nearby

- The records don't say what will be built, so effects on traffic, utilities, schools or jobs can't be judged yet.
- A 4.8-acre site is small, so the effects will probably be local, but this is an inference rather than something the records state.

### Where it stands

The county records show the plan was filed for county review on May 28, 2025, and no later decision was found. A plan like this normally needs borough and county review and approval, then stormwater and building permits, before construction starts.

- **May 28, 2025** Combined preliminary and final land development plan filed for county review

### Who's behind it

Freedom 40 LLC

Planning terms explained

- **Land development:** A formal plan to build or change a site, often adding buildings, parking, roads or utilities.
- **Preliminary/final plan:** A plan submitted for both review stages at once, instead of two separate rounds.
- **Stormwater permit:** State approval, issued through PA DEP, covering how rain runoff is managed during and after construction.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 8, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** Kulpmont Borough's governing body and planning review process usually handle land development plans, and residents can ask the borough office about meeting dates and comment opportunities.

In Pennsylvania, Kulpmont Borough decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Kulpmont Borough planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Kulpmont Borough manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Kulpmont Borough's meeting agendas →](https://www.google.com/search?q=Kulpmont+Borough+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Land development, Kulpmont Borough (4.8 ac)](https://plannednearby.com/x/northumberland-1225-124) — same area · other · Kulpmont Borough · filed 2025-05-28
- [Freedom 40 LLC land development, Kulpmont](https://plannednearby.com/x/northumberland-freedom-40-llc-land-development-kulpmont-6171aa) — same area · other · Kulpmont Borough · filed 2025-05-28
- [Freedom 40 preliminary/final land development](https://plannednearby.com/x/northumberland-1025-105) — same area · other · Kulpmont Borough · filed 2025-05-28
- [Prelim./final land development, Kulpmont Borough](https://plannednearby.com/x/northumberland-825-089) — same area · other · Kulpmont Borough · filed 2025-05-28
- [4.8-acre prelim./final land development, Kulpmont Borough](https://plannednearby.com/x/northumberland-4-8-acre-prelim-final-land-development-k-6171aa) — same area · other · Kulpmont Borough · filed 2025-05-28
- [Prelim/final land development, Kulpmont (4.8 ac)](https://plannednearby.com/x/northumberland-prelim-final-land-development-kulpmont-4-6171aa) — same area · other · Kulpmont Borough · filed 2025-05-28

[See everything nearby on a map →](https://plannednearby.com/near#40.78818,-76.46569,Kulpmont%20Borough)

---

Source page: https://plannednearby.com/x/northumberland-4-8-acre-land-development-kulpmont-borou-6171aa

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
