Boyles Run Solar I & II final land development

Lower Augusta Township, PA · other · 110.0 acres

In short: Boyles Run Solar I & II final land development is a development project in Lower Augusta Township, Northumberland County, PA. The site is 110.0 acres. As of November 24, 2026, it is withdrawn according to web research. Latest record: A project-tracking site says the project left the PJM grid-connection queue in September 2026, and Cleanview lists it as cancelled.

Withdrawn A project-tracking site says the project left the PJM grid-connection queue in September 2026, and Cleanview lists it as cancelled. · web research checked Nov 15, 2026 · source AI research
  1. Proposed
  2. In reviewMar 2025
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

About this project

Final land development plan for Boyles Run Solar I and II on 110 acres in Lower Augusta Township. The agenda does not describe the layout or existing conditions.

Engineer / designer
Manhard Consulting
Plan type
Final land development
Land use
other

Project history

  • 2025-03-28 · #425-034 · Final land development

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 15, 2026

Boyles Run Solar I and II was proposed as two solar power plants on about 110 acres in Lower Augusta Township. The county planning agenda lists a final land development plan filed on 2025-03-28. It does not describe the layout or what is on the land now.

Public energy-industry trackers describe two phases of about 15.9 megawatts each, owned by separate project companies. They were aiming to be running in 2028. Both power-grid queue entries that match the project (PJM AG1-259 and AG1-260) now show as withdrawn, as of late October 2026. One tracker also lists the project as cancelled.

No township minutes, news coverage or builder pages were found. No sign of construction was found. The page's earlier claim that Hodson Energy is the developer is not supported by the cited page, which hides the developer's name.

What it could mean nearby

Where it stands

The county records stop at a final land development plan filed for review on 2025-03-28. Industry trackers show the grid-connection requests withdrawn by October 2026, so the project appears to have been dropped. A county or township decision on the plan was not found. Note: County records show the plan in review, but industry trackers show the matching grid-connection requests withdrawn and the project cancelled; the trackers do not mention the land development plan itself.

Around the web

Planning terms explained
Final land development plan
The detailed site plan a township reviews before allowing construction on a property.
PJM queue
The waiting list of power plants that have asked to connect to the regional electric grid.
Megawatt (MW)
A measure of power output; about 15.9 MW is a small utility-scale solar farm.

Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: Final land development plans are normally decided by the township supervisors, with county planning commission comments; residents can contact Lower Augusta Township or attend its public meetings.

In Pennsylvania, Lower Augusta Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Lower Augusta Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →