# Boyles Run Solar I & II final land development

Lower Augusta Township, PA · other · 110.0 acres

In short: **Boyles Run Solar I & II final land development** is a development project in Lower Augusta Township, Northumberland County, PA. The site is 110.0 acres. As of November 24, 2026, it is withdrawn according to web research. Latest record: A project-tracking site says the project left the PJM grid-connection queue in September 2026, and Cleanview lists it as cancelled.

Stage: Withdrawn · A project-tracking site says the project left the PJM grid-connection queue in September 2026, and Cleanview lists it as cancelled. · web research checked Nov 15, 2026 · [source](https://www.infrasure.ai/project/pjm-ag1-259-boyles-run-solar) AI research

## About this project

Final land development plan for Boyles Run Solar I and II on 110 acres in Lower Augusta Township. The agenda does not describe the layout or existing conditions.

- **Engineer / designer:** [Manhard Consulting](https://plannednearby.com/f/manhard-consulting)
- **Plan type:** Final land development
- **Land use:** other

## Project history

- **2025-03-28** · #425-034 · Final land development

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2)

Map pin is approximate.

## The full picture AI research · Nov 15, 2026

Boyles Run Solar I and II was proposed as two solar power plants on about 110 acres in Lower Augusta Township. The county planning agenda lists a final land development plan filed on 2025-03-28. It does not describe the layout or what is on the land now.

Public energy-industry trackers describe two phases of about 15.9 megawatts each, owned by separate project companies. They were aiming to be running in 2028. Both power-grid queue entries that match the project (PJM AG1-259 and AG1-260) now show as withdrawn, as of late October 2026. One tracker also lists the project as cancelled.

No township minutes, news coverage or builder pages were found. No sign of construction was found. The page's earlier claim that Hodson Energy is the developer is not supported by the cited page, which hides the developer's name.

### What it could mean nearby

- No traffic, jobs or utility effects are documented in the records found.
- Trackers say the plant would have connected to a PPL 69 kV power line, so it would add no homes or pupils.

### Where it stands

The county records stop at a final land development plan filed for review on 2025-03-28. Industry trackers show the grid-connection requests withdrawn by October 2026, so the project appears to have been dropped. A county or township decision on the plan was not found. Note: County records show the plan in review, but industry trackers show the matching grid-connection requests withdrawn and the project cancelled; the trackers do not mention the land development plan itself.

- **Oct 2026** Tracker data shows both Boyles Run grid-queue entries as withdrawn (AG1-259 left the queue in September 2026)
- **Mar 28, 2025** Final land development plan filed for county review
- **Sep 28, 2020** Project entered the PJM grid-connection queue

### Around the web

- [Northumberland County planning commission agenda](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2) — Northumberland County · Mar 28, 2025Lists the final land development filing for Boyles Run Solar I and II.
- [Boyles Run Solar (PJM-AG1-259)](https://www.infrasure.ai/project/pjm-ag1-259-boyles-run-solar) — Infrasure · Oct 25, 2026Shows the project withdrawn from the PJM queue in September 2026; 15.9 MW.
- [Boyles Run Solar (PJM-AG1-260)](https://www.infrasure.ai/project/pjm-ag1-260-boyles-run-solar) — Infrasure · Oct 25, 2026Shows the second queue entry also withdrawn.
- [Boyles Run Solar](https://www.cleanview.co/power-projects/planned/solar-farms/pennsylvania/AG1-259/boyles-run-solar) — CleanviewLists status as cancelled and hides the developer name behind a paid plan.
- [BAI-Boyles Run-Phase I](https://www.interconnection.fyi/eia/plant/67954) — interconnection.fyi (EIA data)Lists Boyles Run Solar I, LLC as owner, 15.9 MW, planned for September 2028.

Planning terms explained

- **Final land development plan:** The detailed site plan a township reviews before allowing construction on a property.
- **PJM queue:** The waiting list of power plants that have asked to connect to the regional electric grid.
- **Megawatt (MW):** A measure of power output; about 15.9 MW is a small utility-scale solar farm.

Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** Final land development plans are normally decided by the township supervisors, with county planning commission comments; residents can contact Lower Augusta Township or attend its public meetings.

In Pennsylvania, Lower Augusta Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Lower Augusta Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Lower Augusta Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Lower Augusta Township's meeting agendas →](https://www.google.com/search?q=Lower+Augusta+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [1.37-acre add-on subdivision, Lower Augusta Twp](https://plannednearby.com/x/northumberland-1024-091) — same area · lot line change · Lower Augusta Township · filed 2024-10-07
- [Add-on subdivision, 24.8-acre tract in Lower Augusta](https://plannednearby.com/x/northumberland-225-018) — same area · lot line change · Lower Augusta Township · filed 2025-02-14
- [Final minor subdivision, Lower Augusta Township](https://plannednearby.com/x/northumberland-1025-103) — same area · subdivision (use not stated) · Lower Augusta Township · filed 2025-10-22
- [Final add-on subdivision, Lower Augusta Twp. (8.478 ac)](https://plannednearby.com/x/northumberland-final-add-on-subdivision-lower-augusta-t-3b8f01) — same area · lot line change · Lower Augusta Township · filed 2026-09-17
- [Final minor subdivision, Lower Augusta Twp.](https://plannednearby.com/x/northumberland-final-minor-subdivision-lower-augusta-tw-a85246) — same area · subdivision (use not stated) · Lower Augusta Township · filed 2026-01-14
- [Minor subdivision, Shepperson Farms, Lower Augusta](https://plannednearby.com/x/northumberland-1224-112) — same area · subdivision (use not stated) · Lower Augusta Township · filed 2024-12-17

[See everything nearby on a map →](https://plannednearby.com/near#40.77509,-76.82521,Lower%20Augusta%20Township)

---

Source page: https://plannednearby.com/x/northumberland-425-034

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.