[Northumberland County](https://plannednearby.com/c/northumberland-pa/) · [Herndon Borough](https://plannednearby.com/c/northumberland-pa/herndon-borough) · #425-036

# Herndon Reload storage shed land development

Herndon Borough, PA · warehouse & storage · 5.6 acres

In short: **Herndon Reload storage shed land development** is a warehouse and storage development in Herndon Borough, Northumberland County, PA. The site is 5.6 acres. As of November 24, 2026, it is in review. Latest record: Final land development filed for county review (December 12, 2024). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Final land development filed for county review · Dec 12, 2024 · [source](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

Final land development plan for a storage shed by Herndon Reload Company on 5.57 acres in Herndon Borough. The plan was tabled from the March 25, 2025 meeting and is also listed for a time extension.

- **Applicant:** [Herndon Reload Company](https://plannednearby.com/f/herndon-reload-co)
- **Engineer / designer:** Cole Boyer, P.E.
- **Plan type:** Final land development
- **Land use:** other

## Project history

- **2024-12-12** · #425-036 · Final land development

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2)

Map pin is approximate.

## The full picture AI research · Nov 15, 2026

Herndon Reload Company has filed a final land development plan to build a storage shed on a 5.57-acre site in Herndon Borough, Northumberland County. The records give no building size, and they don't say whether the site is the company's existing plant.

The company already operates in the borough. A 2023 trade-magazine profile describes it as a rail freight reload and wood-products business on the Norfolk Southern main line. It has existing warehouses and a lumberyard on a roughly 25-acre site. That profile does not mention a new shed.

The county summary says the plan was tabled at the March 25, 2025 Planning Commission meeting and is also listed for a time extension. No news coverage, opposition, construction or approval was found online.

### What it could mean nearby

- The shed would add storage at what appears to be an existing industrial rail-served operation, so a big change in land use is not indicated, though the records do not confirm the exact location.
- The records do not say whether the shed would change truck traffic or the number of jobs.

### Where it stands

County records show the final plan was filed for review on 2024-12-12. It was tabled at the March 25, 2025 county Planning Commission meeting and listed for a time extension. No later approval, permit or construction was found. Usually the plan is either approved, possibly with conditions, or the review deadline is extended while open comments are resolved.

- **Mar 25, 2025** County Planning Commission meeting where the plan was tabled, per the county summary
- **Dec 12, 2024** Final land development plan filed for county review
- **Sep 18, 2023** State DEP air-quality operating permit issued for the existing Herndon Reload plant

### Who's behind it

Herndon Reload Company · A Herndon, PA rail freight reload and wood-components business, founded in 2005, that makes bed foundation parts, pallets and similar products and employs roughly 25 to 30 people, according to a 2023 magazine profile.

### Around the web

- [Northumberland County planning commission agenda listings](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2) — Northumberland County, PA · Mar 25, 2025Lists the 2025 Planning Commission meetings, including March 25, 2025. The page itself does not mention Herndon Reload.
- [Herndon Reload's success story](https://bedtimesmagazine.com/2023/10/herndon-reloads-success-story/) — Bedtimes Magazine · Oct 11, 2023Describes the company's rail reload and wood-products operations, its roughly 25-acre site, its 25 to 30 employees and its planned machinery upgrades.
- [State-only synthetic minor operating permit, Herndon Reload Co](https://files.dep.state.pa.us/air/AirQuality/AQPortalFiles/Permits/PermitDocuments/1424903[49-00059]_Issued_v1.pdf) — PA Department of Environmental Protection · Sep 18, 2023Confirms the company's existing plant at 386 Pennsylvania Avenue, Herndon, which is not necessarily the shed site.

Planning terms explained

- **Final land development plan:** The detailed site plan for a building project, which the municipality and county review before work can begin.
- **Tabled:** A board postponed action on the item to a later meeting without approving or denying it.
- **Time extension:** A request to lengthen the legal deadline for a board to act on a plan.
- **Reload facility:** A site where goods are moved between rail cars and trucks, and sometimes stored.

Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Northumberland County Planning Commission is reviewing the plan, and comments can go to the county planning office or to the Herndon Borough council.

In Pennsylvania, Herndon Borough decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Herndon Borough planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Herndon Borough manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Herndon Borough's meeting agendas →](https://www.google.com/search?q=Herndon+Borough+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Northumberland Solar 1 land development, Jackson Twp](https://plannednearby.com/x/northumberland-924-088) — same area · subdivision (use not stated) · Jackson Township · filed 2024-08-19
- [8.0-acre solar project, Herndon Borough](https://plannednearby.com/x/northumberland-2026-08-8-0-acre-solar-project-herndon-borough) — same area · other · Herndon Borough · filed 2026-07-10
- [Pivot PAL 055 land development, Jackson Twp](https://plannednearby.com/x/northumberland-525-046) — same area · other · Jackson Township · filed 2025-03-14
- [Storage shed land development, Jackson Township](https://plannednearby.com/x/northumberland-storage-shed-land-development-jackson-to-49036f) — same area · warehouse & storage · Jackson Township · filed 2026-05-14
- [St. Louis De Montfort Academy activities building](https://plannednearby.com/x/northumberland-st-louis-de-montfort-academy-activities-dff0ac) — same area · school · Jackson Township · filed 2026-06-11
- [Herndon Reload Company storage shed land development](https://plannednearby.com/x/northumberland-325-027) — same area · warehouse & storage · Herndon Borough · filed 2024-12-12

[See everything nearby on a map →](https://plannednearby.com/near#40.71168,-76.84721,Herndon%20Borough)

---

Source page: https://plannednearby.com/x/northumberland-425-036

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
