[Northumberland County](https://plannednearby.com/c/northumberland-pa/) · [Herndon Borough](https://plannednearby.com/c/northumberland-pa/herndon-borough) · #525-045

# Herndon Reload Company storage shed, Herndon

Herndon Borough, PA · warehouse & storage · 5.6 acres

In short: **Herndon Reload Company storage shed, Herndon** is a warehouse and storage development in Herndon Borough, Northumberland County, PA. The site is 5.6 acres. As of November 24, 2026, it is in review. Latest record: Final land development filed for county review (December 12, 2024). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Final land development filed for county review · Dec 12, 2024 · [source](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

A storage shed for Herndon Reload Company on a 5.57-acre site in Herndon Borough. The plan was tabled at the March and April 2025 meetings.

- **Applicant:** [Herndon Reload Company](https://plannednearby.com/f/herndon-reload-co)
- **Engineer / designer:** Cole Boyer, P.E.
- **Plan type:** Final land development
- **Land use:** other

## Project history

- **2024-12-12** · #525-045 · Final land development

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2)

Map pin is approximate.

## The full picture AI research · Nov 15, 2026

Herndon Reload Company has proposed a storage shed on a 5.57-acre site in Herndon Borough, Northumberland County. County records show the final land development plan was filed for county review on 2024-12-12. The plan was tabled at the March and April 2025 meetings.

The company is an established rail freight and wood-products business in Herndon. Public profiles describe it as a rail "reload" site on the Norfolk Southern main line. It unloads, stores and reships goods, and it also makes wood bed-foundation parts. A state air permit lists its plant at 386 Pennsylvania Ave. These sources do not confirm that this address is the shed site. The shed is presumably an addition to that operation, but that is an inference.

No news coverage, borough minutes or builder page about the shed was found. No sign of construction or completion was found either.

### What it could mean nearby

- The shed would add covered storage at an existing rail-served freight site, so truck and rail activity could continue or grow. No traffic study was found.
- The company says it employs about 25 to 30 people. No source says whether the shed would add jobs.

### Where it stands

The final land development plan was filed for county review on 2024-12-12 and was tabled at the March and April 2025 meetings. No later approval, permit or construction record was found. Usually the plan is approved, often with conditions, before building permits are issued.

- **Apr 2025** Plan tabled again at the county planning meeting
- **Mar 2025** Plan tabled at the county planning meeting
- **Dec 12, 2024** Final land development filed for county review
- **Sep 18, 2023** State air permit dated for the company's Herndon plant

### Who's behind it

Herndon Reload Company · A Herndon, PA rail reload and wood-products business founded in 2005. It handles freight storage and transfer and makes bed-foundation parts and animal bedding.

### Around the web

- [Northumberland County planning commission agenda feed](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2) — Northumberland County, PA · Dec 12, 2024Source of the county filing record; the feed lists 2025 agenda and minutes posts but does not describe the shed.
- [Herndon Reload's success story](https://bedtimesmagazine.com/2023/10/herndon-reloads-success-story/) — BedTimes Magazine · Oct 1, 2023Profile of the company: founded in 2005, on the Norfolk Southern line, with warehouse and lumberyard storage, about 25-30 workers; no mention of a new shed.
- [Air quality operating permit, Herndon Reload Co/Herndon Plant](https://files.dep.state.pa.us/air/AirQuality/AQPortalFiles/Permits/PermitDocuments/1424903[49-00059]_Issued_v1.pdf) — PA Department of Environmental Protection · Sep 18, 2023Shows the company's plant at 386 Pennsylvania Ave, Herndon, in Northumberland County.

Planning terms explained

- **Final land development plan:** The detailed site plan that must be approved before a new building or major site change can proceed.
- **Tabled:** A board postponed a decision to a later meeting without approving or rejecting the plan.
- **Reload facility:** A site where goods are moved between rail cars and trucks, often with storage in between.

Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Northumberland County planning commission reviews the plan, and the Herndon Borough council also acts on land development plans. Comments can go to either body at its public meetings.

In Pennsylvania, Herndon Borough decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Herndon Borough planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Herndon Borough manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Herndon Borough's meeting agendas →](https://www.google.com/search?q=Herndon+Borough+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [5.57-acre storage shed land dev., Herndon](https://plannednearby.com/x/northumberland-525-057) — same area · warehouse & storage · Herndon Borough · filed 2024-12-12
- [Herndon Reload solar project, Herndon Borough](https://plannednearby.com/x/northumberland-2026-07-herndon-reload-solar-project-herndon-bor) — same area · other · Herndon Borough · filed 2026-07-10
- [Herndon Reload Solar Project (8.0 LOD)](https://plannednearby.com/x/northumberland-2026-09-herndon-reload-solar-project-8-0-lod) — same area · other · Herndon Borough · filed 2026-07-10
- [11,680 SF storage shed, Jackson Township](https://plannednearby.com/x/northumberland-11-680-sf-storage-shed-jackson-township-49036f) — same area · 11,680 sq ft non-residential, warehouse & storage · Jackson Township · filed 2026-05-14
- [Storage shed land development, Jackson Township](https://plannednearby.com/x/northumberland-storage-shed-land-development-jackson-to-49036f) — same area · warehouse & storage · Jackson Township · filed 2026-05-14
- [Storage shed land development, Herndon Borough](https://plannednearby.com/x/northumberland-1224-117) — same area · warehouse & storage · Herndon Borough · filed 2024-12-17

[See everything nearby on a map →](https://plannednearby.com/near#40.71012,-76.86478,Herndon%20Borough)

---

Source page: https://plannednearby.com/x/northumberland-525-045

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
