[Northumberland County](https://plannednearby.com/c/northumberland-pa/) · [Jackson Township](https://plannednearby.com/c/northumberland-pa/jackson-township) · #525-046

# Pivot PAL 055 land development, Jackson Twp

Jackson Township, PA · other · 20.2 acres

In short: **Pivot PAL 055 land development, Jackson Twp** is a development project in Jackson Township, Northumberland County, PA. The site is 20.2 acres. As of November 24, 2026, it is in review. Latest record: Preliminary/final land development filed for county review (March 14, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Preliminary/final land development filed for county review · Mar 14, 2025 · [source](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

A land development called Pivot PAL 055 on a 20.2-acre site in Jackson Township, surveyed by BL Companies. The plan was tabled at the March and April 2025 meetings.

- **Engineer / designer:** BL Companies
- **Plan type:** Preliminary/final land development
- **Land use:** other

## Project history

- **2025-03-14** · #525-046 · Preliminary/final land development

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2)

Map pin is approximate.

## The full picture AI research · Nov 12, 2026

A land development plan called Pivot PAL 055 was filed with Northumberland County for a 20.2-acre site in Jackson Township. BL Companies, a surveying and engineering firm, is listed on the filing. The county summary doesn't say what will be built, how many buildings or homes are planned, or who owns the land.

The county's summary says the plan was tabled at its March and April 2025 meetings. Tabled means the reviewers set it aside without deciding. The filing is a combined preliminary/final plan, so the developer asked for both review steps at once.

No developer website, news story, township agenda, permit or listing was found that clearly matches this project. What is on the site today is unknown.

### Where it stands

County records show the plan in review as of its 2025-03-14 filing, and it was tabled at the March and April 2025 county meetings. No later source shows an approval, a permit, construction or a withdrawal, so those outcomes can't be confirmed. Usually a tabled plan comes back once the applicant answers reviewers' comments, and the township then acts on it.

- **Apr 2025** Plan tabled again at the county meeting (per county summary)
- **Mar 14, 2025** Preliminary/final land development filed for county review
- **Mar 2025** Plan tabled at the county meeting (per county summary)

### Around the web

- [Northumberland County planning commission agenda feed](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2) — Northumberland County, PA · Mar 14, 2025Lists the county planning commission agendas and minutes and is the record behind the 2025-03-14 filing. The page text itself did not name Pivot PAL 055.

Planning terms explained

- **Land development:** A formal plan to build or change a site, such as new buildings, parking or roads, which the township and county review.
- **Preliminary/final plan:** A single submission that asks for both the early-stage and the last-stage review, instead of two separate ones.
- **Tabled:** A board set the item aside to a later meeting without approving or denying it.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 12, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Jackson Township supervisors and the Northumberland County planning commission handle review of land development plans, so residents can contact the township office or attend its public meetings. A specific hearing date for this plan was not found.

In Pennsylvania, Jackson Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Jackson Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Jackson Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Jackson Township's meeting agendas →](https://www.google.com/search?q=Jackson+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Northumberland Solar 1 land development, Jackson Twp](https://plannednearby.com/x/northumberland-924-088) — same area · subdivision (use not stated) · Jackson Township · filed 2024-08-19
- [Storage shed land development, Jackson Township](https://plannednearby.com/x/northumberland-storage-shed-land-development-jackson-to-49036f) — same area · warehouse & storage · Jackson Township · filed 2026-05-14
- [Herndon Reload Company storage shed land development](https://plannednearby.com/x/northumberland-325-027) — same area · warehouse & storage · Herndon Borough · filed 2024-12-12
- [Herndon Reload storage shed land development](https://plannednearby.com/x/northumberland-425-036) — same area · warehouse & storage · Herndon Borough · filed 2024-12-12
- [Herndon Reload Solar Project, 8.0 LOD](https://plannednearby.com/x/northumberland-herndon-reload-solar-project-8-0-lod-b439ee) — same area · other · Herndon Borough · filed 2026-07-10
- [8.0-acre solar project, Herndon Borough](https://plannednearby.com/x/northumberland-2026-08-8-0-acre-solar-project-herndon-borough) — same area · other · Herndon Borough · filed 2026-07-10

[See everything nearby on a map →](https://plannednearby.com/near#40.71205,-76.84938,Jackson%20Township)

---

Source page: https://plannednearby.com/x/northumberland-525-046

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
