[Northumberland County](https://plannednearby.com/c/northumberland-pa/) · [Ralpho Township](https://plannednearby.com/c/northumberland-pa/ralpho-township) · #525-048

# Clarks Feed Mill land development, Ralpho Twp

Ralpho Township, PA · 17,420 sq ft non-residential, other

In short: **Clarks Feed Mill land development, Ralpho Twp** is a development project in Ralpho Township, Northumberland County, PA. It will add 17,420 sq ft of non-residential space. Its estimated construction value is about $3.5M, a rough estimate from its size. As of November 24, 2026, it is under construction according to web research. Latest record: A Feed & Grain article reports that Clark's Feed Mill began a major concrete pour for a new 120-foot mill tower, following an earlier article on its… What usually happens next: completion and occupancy.

Stage: Under construction · A Feed & Grain article reports that Clark's Feed Mill began a major concrete pour for a new 120-foot mill tower, following an earlier article on its groundbreaking. · web research checked Nov 21, 2026 · [source](https://www.feedandgrain.com/animal-feed-manufacturing/feed-mill-renovations-builds/news/15827101/clarks-feed-mill-begins-major-concrete-pour-for-new-mill) AI research

Usually next: completion and occupancy.

## About this project

Preliminary/final land development for Clarks Feed Mill in Ralpho Township, covering 17,420 sq ft. The agenda does not describe existing conditions.

- **Applicant:** Clarks Feed Mill
- **Engineer / designer:** [PennCore Consulting](https://plannednearby.com/f/penncore-consulting-llc)
- **Plan type:** Prelim/Final land development
- **Land use:** other

## Project history

- **2025-05-22** · #525-048 · Prelim/Final land development · 17,420 sq ft

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2)

Map pin is approximate.

## The full picture AI research · Nov 21, 2026

Clark's Feed Mill, a family-run animal feed maker, filed a land development plan with the county for a 17,420-square-foot non-residential project in Ralpho Township. The county agenda does not say what was on the site before.

Trade press describes a multimillion-dollar expansion that includes a new mill tower about 120 feet tall. The company says it aims to roughly quadruple production with a new facility by 2027. A later report says a major concrete pour for the tower had started, with crews working around the clock for about a week. Those articles were read only as search-result summaries, because the pages blocked direct access. They do not name Ralpho Township, so the link to this filing rests on the county records, which cite a November 2025 groundbreaking.

No township minutes, tenant announcements or opening notices were found.

### What it could mean nearby

- The trade report said concrete trucks and construction vehicles could cause traffic slowdowns near the site during the pour.
- The report described round-the-clock work with about 200 workers on site during the pour.
- A larger mill aiming to quadruple production could mean more truck traffic once it operates, though no traffic study was found.

### Where it stands

Work is under way: the county records cite a November 2025 groundbreaking, and a trade article reports a concrete pour for the new mill tower. The next steps would be finishing the structure and equipment and starting production, which the company targets for 2027.

- **2027** Company's stated target for the new facility (per trade press)
- **Nov 2025** Groundbreaking cited in county records and reported by trade press
- **May 22, 2025** Preliminary/final land development filed for county review

### Who's behind it

Clark's Feed Mill · A family-owned feed manufacturer that, per trade press, has served farmers since 1929.

### Around the web

- [Clark's Feed Mill begins major concrete pour for new mill](https://www.feedandgrain.com/animal-feed-manufacturing/feed-mill-renovations-builds/news/15827101/clarks-feed-mill-begins-major-concrete-pour-for-new-mill) — Feed & GrainReports a concrete pour for a new 120-foot mill tower, with round-the-clock work and possible traffic delays.
- [Clark's Feed Mill breaks ground on multimillion-dollar expansion project](https://www.feedandgrain.com/animal-feed-manufacturing/feed-mill-renovations-builds/news/15772513/clarks-feed-mill-breaks-ground-on-multimilliondollar-expansion-project) — Feed & GrainReports a groundbreaking and a goal of quadrupling production with a new facility by 2027.
- [Northumberland County planning commission agenda results](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=2) — Northumberland County · May 22, 2025Shows the preliminary/final land development filing.

Planning terms explained

- **Land development:** A formal township and county review of a plan to build on a site, covering layout, access, and stormwater.
- **Preliminary/final plan:** A combined submission that lets the review be done in a single step rather than two.
- **Non-residential:** Building space that is not housing, such as industrial or commercial space.

Researched by AI from public sources on Nov 21, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** Ralpho Township's planning commission and supervisors normally handle land development plans, and residents can comment at their public meetings. Since work has started, the approval stage has likely passed, and no meeting dates were found.

In Pennsylvania, Ralpho Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Ralpho Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Ralpho Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Ralpho Township's meeting agendas →](https://www.google.com/search?q=Ralpho+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$3.5M**

- ~174 roofing squares (assumes 1 story)
- ~43 tons of cooling (rule of thumb 400 sq ft/ton)

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Final minor subdivision on Circle View Dr, Ralpho](https://plannednearby.com/x/northumberland-final-minor-subdivision-on-circle-view-d-0a4f3b) — same area · lot line change · Ralpho Township · filed 2026-07-22
- [Minor subdivision, Pine Hill Cemetery, Ralpho Twp](https://plannednearby.com/x/northumberland-125-004) — same area · subdivision (use not stated) · Ralpho Township · filed 2025-01-13
- [Airport Authority 3,800 SF land development](https://plannednearby.com/x/northumberland-airport-authority-3-800-sf-land-developm-3cbb16) — same area · 3,800 sq ft non-residential, government & utilities · Ralpho Township · filed 2026-05-20
- [Add-on subdivision, Ralpho Township](https://plannednearby.com/x/northumberland-825-083) — same area · lot line change · Ralpho Township · filed 2025-08-19
- [4.08-acre add-on subdivision, Ralpho Township](https://plannednearby.com/x/northumberland-4-08-acre-add-on-subdivision-ralpho-town-5e67e7) — same area · lot line change · Ralpho Township · filed 2026-03-18
- [36.33-acre minor subdivision in Ralpho Township](https://plannednearby.com/x/northumberland-36-33-acre-minor-subdivision-in-ralpho-t-b2a4ee) — same area · subdivision (use not stated) · Ralpho Township · filed 2026-03-18

[See everything nearby on a map →](https://plannednearby.com/near#40.85667,-76.51777,Ralpho%20Township)

---

Source page: https://plannednearby.com/x/northumberland-525-048

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
