[Northumberland County](https://plannednearby.com/c/northumberland-pa/) · [Rockefeller Township](https://plannednearby.com/c/northumberland-pa/rockefeller-township) · #924-083

# Final add-on subdivision in Rockefeller Township

Rockefeller Township, PA · lot line change · 6.9 acres

In short: **Final add-on subdivision in Rockefeller Township** is a lot line change in Rockefeller Township, Northumberland County, PA. The site is 6.9 acres. As of November 24, 2026, the public records we track show nothing newer since September 13, 2024. The town may have acted since.

Stage: No recent records · Latest record we have · Sep 13, 2024

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

## About this project

A final add-on subdivision for a 6.93-acre property owned by a private estate in Rockefeller Township. The agenda does not describe the proposed lot changes or the current use of the land.

- **Engineer / designer:** [Ziegler Surveying LLC](https://plannednearby.com/f/zeigler-surveying-llc)
- **Plan type:** Final add-on subdivision
- **Land use:** lot-line-change

## Project history

- **2024-09-13** · #924-083 · Final add-on subdivision

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3)

Map pin is approximate.

## The full picture AI research · Nov 15, 2026

This is a final add-on subdivision filed with Northumberland County in September 2024. It covers a 6.93-acre property in Rockefeller Township owned by a private estate. An add-on subdivision moves land from one parcel to a neighboring one, so it adjusts boundaries and doesn't create a new building lot. The county listed it as a lot line change.

The county agenda doesn't say which land is being moved, who is receiving it, or how the land is used now. A surveying firm, Ziegler Surveying LLC, prepared the filing.

No developer, builder, news story, listing, business, construction notice or opposition was found for this site. Nothing found online suggests any building is planned.

### What it could mean nearby

- Nothing in the records points to new homes, businesses, traffic or utility changes. Add-on plans are generally just boundary adjustments.
- Township rules say an add-on lot is generally marked 'not for development'. Whether that note appears on this plan was not confirmed.

### Where it stands

The county has a final add-on subdivision filing dated 2024-09-13, and no later record was found. No approval, recording or other outcome was confirmed. If approved, the plan is normally recorded with the county Recorder of Deeds.

- **Sep 13, 2024** Final add-on subdivision filed for county review

### Around the web

- [Northumberland County planning commission agenda feed](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3) — Northumberland County, PA · Sep 13, 2024This is the county listing that records the filing. The page itself showed no Rockefeller entry when fetched, so the facts come from the supplied county record.
- [Northumberland County Planning Commission Meeting Agenda (Oct 22, 2024)](https://northumberlandcountypa.gov/htdocs/wp-content/uploads/documents/planning/2024_10_22_planning.pdf) — Northumberland County, PA · Oct 22, 2024This agenda lists other Rockefeller Township items, such as a solar project, but no entry matching this add-on was found.
- [Add-on subdivision provisions](https://ecode360.com/15053715) — eCode360The code's page header didn't name the municipality. It describes add-on plans as needing only a final plan and a 'not for development' note, and says they are recorded within 90 days of approval.

Planning terms explained

- **Add-on subdivision:** A division of land in which a piece is split off and joined to a neighboring property, instead of becoming a new lot.
- **Lot line change:** An adjustment to the boundary between neighboring properties that doesn't create a new lot.
- **Final plan:** The last version of a subdivision plan submitted for approval before it is recorded.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The county planning commission reviews the plan and the Rockefeller Township supervisors normally approve add-on plans. Residents can contact the township office or attend its public meetings.

In Pennsylvania, Rockefeller Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Rockefeller Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Rockefeller Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Rockefeller Township's meeting agendas →](https://www.google.com/search?q=Rockefeller+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Minor subdivision, Rockefeller Township](https://plannednearby.com/x/northumberland-125-009) — same area · subdivision (use not stated) · Rockefeller Township · filed 2025-01-22
- [Pivot Solar PAL056 preliminary land development](https://plannednearby.com/x/northumberland-1024-093) — same area · other · Rockefeller Township · filed 2024-09-27
- [Minor subdivision in Rockefeller Township](https://plannednearby.com/x/northumberland-1125-115) — same area · subdivision (use not stated) · Rockefeller Township · filed 2025-11-14
- [Add-on subdivision & land dev., Rockefeller Twp.](https://plannednearby.com/x/northumberland-725-068) — same area · subdivision (use not stated) · Rockefeller Township · filed 2025-06-27
- [150.72-acre final land development, Rockefeller Township](https://plannednearby.com/x/northumberland-150-72-acre-final-land-development-rocke-cf2e83) — same area · other · Rockefeller Township · filed 2026-08-04
- [42-acre final land development/minor subdivision](https://plannednearby.com/x/northumberland-1124-100) — same area · subdivision (use not stated) · Rockefeller Township · filed 2024-10-25

[See everything nearby on a map →](https://plannednearby.com/near#40.83353,-76.73312,Rockefeller%20Township)

---

Source page: https://plannednearby.com/x/northumberland-924-083

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
