# Northumberland Solar 1 land development, Jackson Twp

Jackson Township, PA · subdivision (use not stated) · 165.7 acres

In short: **Northumberland Solar 1 land development, Jackson Twp** is a subdivision in Jackson Township, Northumberland County, PA. The site is 165.7 acres. As of November 24, 2026, the public records we track show nothing newer since August 19, 2024. The town may have acted since.

Stage: No recent records · Latest record we have · Aug 19, 2024

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

## About this project

Northumberland Solar 1, LLC submitted a combined preliminary/final minor subdivision and land development plan covering 165.69 acres in Jackson Township. The agenda does not describe the proposed solar facility or the current use of the land.

- **Applicant:** [Northumberland Solar 1, LLC](https://plannednearby.com/f/northumberland-solar-1-llc)
- **Engineer / designer:** [New Leaf Energy, Inc.](https://plannednearby.com/f/new-leaf-energy-inc)
- **Plan type:** Preliminary/final minor subdivision/land development
- **Land use:** other

## Project history

- **2024-08-19** · #924-088 · Preliminary/final minor subdivision/land development

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3)

Map pin is approximate.

## The full picture AI research · Nov 16, 2026

Northumberland Solar 1, LLC filed a combined preliminary/final minor subdivision and land development plan with the county. It covers 165.69 acres in Jackson Township, Northumberland County. The developer name and project title point to a solar facility. The county agenda doesn't describe the facility's size or the land's current use.

No township documents, news coverage, developer project page or permit records were found for this site. The search turned up a separate, operating solar plant near Milton in Northumberland County. It covers about 842 acres and has a different owner, and no source ties it to this 165.69-acre site. Nothing found shows opposition, approvals or construction here.

### What it could mean nearby

- Solar facilities usually add little daily traffic once built. Construction traffic is typical for a few months. No project-specific traffic information was found.
- The records don't say what the land is used for now, so the effect on farmland or open space can't be judged.

### Where it stands

The only record is a county planning filing dated 2024-08-19, and nothing later was found. Next steps usually include county and township review of the plan, and then state stormwater and building permits before construction.

- **Aug 19, 2024** Combined preliminary/final minor subdivision and land development plan filed for county review

### Who's behind it

Northumberland Solar 1, LLC (with New Leaf Energy, Inc.) · New Leaf Energy is described in search results as a developer of solar and storage projects, including community solar.

### Around the web

- [Northumberland County planning commission agendas](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3) — Northumberland County, PA · Aug 19, 2024County feed that carries the filing for this project.

Planning terms explained

- **Land development:** A formal plan to build or change a site, such as adding a solar array, which the township reviews.
- **Minor subdivision:** A simpler division of land into a small number of parcels.
- **Preliminary/final plan:** A plan reviewed as both the first and last approval step in one filing.
- **Stormwater permit:** A state-reviewed permit controlling runoff from construction sites.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 16, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Jackson Township supervisors and planning body decide on local land development approval, and residents can usually comment at their public meetings. Meeting dates weren't found.

In Pennsylvania, Jackson Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Jackson Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Jackson Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Jackson Township's meeting agendas →](https://www.google.com/search?q=Jackson+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Pivot PAL 055 land development, Jackson Twp](https://plannednearby.com/x/northumberland-525-046) — same area · other · Jackson Township · filed 2025-03-14
- [Storage shed land development, Jackson Township](https://plannednearby.com/x/northumberland-storage-shed-land-development-jackson-to-49036f) — same area · warehouse & storage · Jackson Township · filed 2026-05-14
- [Herndon Reload storage shed land development](https://plannednearby.com/x/northumberland-425-036) — same area · warehouse & storage · Herndon Borough · filed 2024-12-12
- [8.0-acre solar project, Herndon Borough](https://plannednearby.com/x/northumberland-2026-08-8-0-acre-solar-project-herndon-borough) — same area · other · Herndon Borough · filed 2026-07-10
- [Herndon Reload Company storage shed land development](https://plannednearby.com/x/northumberland-325-027) — same area · warehouse & storage · Herndon Borough · filed 2024-12-12
- [Herndon Reload Solar Project, 8.0 LOD](https://plannednearby.com/x/northumberland-herndon-reload-solar-project-8-0-lod-b439ee) — same area · other · Herndon Borough · filed 2026-07-10

[See everything nearby on a map →](https://plannednearby.com/near#40.71142,-76.84866,Jackson%20Township)

---

Source page: https://plannednearby.com/x/northumberland-924-088

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.