Ocean County · Brick Township · #BRT2015B
Mixed-use: 2 apartments, contractor shop & office
Drum Point Road, Brick Township, NJ · 2 homes, 6,200 sq ft non-residential, mixed use · 0.7 acres
About this project
A site plan on 0.65 acres along Drum Point Road in Brick Township for a mixed-use building with two apartments, a contractor shop and an office, about 6,200 sq ft in total.
Official description: Mixed use: 2 residential apartments & a contractor shop & office
- Engineer / designer
- Morgan Enginering & Surveying, LLC
- Plan type
- Site plan
- Land use
- CR
- Status
- On Agenda
The full picture AI research · Nov 1, 2026
The project is on a 0.65-acre lot on Drum Point Road in Brick Township. County records describe a mixed-use site plan: a building with two apartments, a contractor shop and an office, about 6,200 square feet in all.
A local news report on the township planning board's October 2025 approval appears to cover this site. It describes a revised plan for 251 Drum Point Road on a lot of about 0.65 acres. That plan replaces an earlier approval for a pole-barn contractor shop and a two-story building with homes and businesses. The new version has two structures. One is a contractor's garage of roughly 3,000 square feet. The other is a two-story building with a 650-square-foot office and two apartments. The report says the uses fit township zoning, and only minor parking variances were needed.
The report does not say who will occupy the space. The article could not be opened directly, so these details come from a search summary of it.
What it could mean nearby
- Two new apartments would add a small number of homes.
- A contractor shop and office would bring business activity and some work vehicles to Drum Point Road.
- The parking variances show on-site parking was a point the board looked at.
Where it stands
The Brick planning board reportedly approved a revised plan in October 2025. The county filing is dated June 2025. Next steps usually include resolution of approval, permits and construction, but no construction timing was found.
- Oct 2025 Brick planning board reportedly approved the revised mixed-use plan, replacing an earlier approval
- Jun 18, 2025 Latest county planning filing
Want to weigh in? The Brick Township Planning Board has already acted on this plan, so residents can follow later township construction and permit steps through the township.
Around the web
- Brick Planning Board Approves Mixed-Use Development, Replacing Prior ApprovalShorebeat · Oct 1, 2025Reports approval of a revised plan for a contractor garage, office and two apartments on about 0.65 acres on Drum Point Road.
Planning terms explained
- Site plan
- A detailed drawing showing buildings, parking, driveways and landscaping on a lot, which a town reviews before construction.
- Mixed use
- A project combining different uses, such as homes and businesses, on one property.
- Variance
- Permission to depart from a specific zoning rule, such as the number of required parking spaces.
- Planning board
- A township board that reviews development plans for compliance with local rules.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $2.7M
- ~64 roofing squares
- ~2 HVAC systems
- ~2 kitchens / 4+ bathrooms
- ~5,600 sq ft of finished living space
- ~20 roofing squares (assumes 3 stories)
- ~15 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →