Ocean County · Jackson Township · #JT1763
Contractor Warehouse
Allyson Road, Jackson Township, NJ · 57,000 sq ft non-residential, warehouse & storage · 10.6 acres
About this project
A 57,000 sq ft industrial contractor warehouse is proposed on a 10.6-acre site off Allyson Road in Jackson Township.
Official description: Contractor Warehouse
- Engineer / designer
- Dynamic Engineering, Consultants, PC
- Plan type
- Site plan
- Land use
- Industrial
- Status
- Approved with Contingency
The full picture AI research · Nov 1, 2026
A 57,000-square-foot industrial warehouse for contractors is proposed on a site of about 10.6 acres off Allyson Road in Jackson Township, Ocean County. County records describe it as warehouse and storage space. The building would be roughly the size of a large big-box store.
The records don't say what is on the site now, who would occupy the building, or whether the township has approved it. The latest county filing is dated January 2024. The filing lists an engineering firm, Dynamic Engineering Consultants, PC, as involved.
No news coverage, meeting agendas, or developer webpage clearly about this project were found. A search turned up a different Allyson Road proposal for flex-space buildings, but it could not be matched to this project, so it is not used here.
What it could mean nearby
- A building this size would probably bring truck and contractor-vehicle traffic to Allyson Road, but no traffic study was found.
- The project would add non-residential space, which could bring some jobs. The number is not known.
- About 10.6 acres would be developed. Whether that is wooded or open land now is not stated in the records.
Where it stands
A county planning filing was made in January 2024. Nothing found online shows whether the township planning board has held a hearing or approved it. Projects like this usually need site plan approval from the local planning board, then construction permits and state environmental permits.
- Jan 17, 2024 Latest filing in the county planning records
Want to weigh in? The Jackson Township Planning Board would normally decide on a site plan like this. Residents can usually comment at its public hearings, and the township posts agendas and notices.
Planning terms explained
- Site plan approval
- A local board's review of a building's layout, parking, drainage, lighting and access before it can be built.
- Planning board
- A township body that reviews development applications and decides whether they meet local rules.
- Non-residential square footage
- Floor area used for businesses, storage or industry rather than homes.
- Warehouse & storage
- A building category for enclosed space that stores goods or equipment instead of serving as retail or offices.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $7.4M
- ~570 roofing squares (assumes 1 story)
- ~142 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →