Ocean County · Lakewood Township · #LAT1728B

School, playground and four duplexes

Edgecomb Avenue, Lakewood Township, NJ · 9,742 sq ft non-residential, school · 6.0 acres

About this project

A site plan for a school, a playground and four duplexes on about 6 acres on Edgecomb Avenue in Lakewood Township. The school portion includes roughly 9,742 square feet of non-residential space.

Official description: School, playground,4 duplexes

Applicant
Cong Sanz of Lakewood
Engineer / designer
NewLines Engineering
Plan type
Site plan
Land use
P
Status
Approved with Contingency

Filing history

  • 2024-02-21 · #LAT1728B · Site plan · 9,742 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

The county filing describes a site plan for a school, a playground and four duplex buildings on about 6 acres along Edgecomb Avenue in Lakewood Township. The school would have about 9,742 square feet of non-residential space.

Township planning board records from 2014 to 2016 describe a very similar plan at 120 Edgecomb Avenue. It was a two-story school with a basement, four duplexes, and sports courts on a wooded, vacant site. The applicant in those records was a different school organization from the one on the 2024 filing, so the 2024 filing may be a revived or revised version of that plan. No source confirms this. No news coverage, opposition, or final approval status for the 2024 filing was found.

What it could mean nearby

Where it stands

The county shows a site plan filed on 2024-02-21. Records found online cover only the earlier version, so the current township decision is unconfirmed. Usually the planning board holds a public hearing, votes on the site plan, and then adopts a written resolution listing conditions.

Want to weigh in? The Lakewood Township Planning Board would normally decide on a site plan, and residents can speak at its public hearing. Hearing dates are posted on the township website.

Who's behind it

Cong Sanz of Lakewood

Around the web

Planning terms explained
Site plan
A detailed drawing showing where buildings, parking, driveways and drainage would go on a property.
Preliminary and final major site plan
A request for both the main approval and the final approval of a larger project at one time.
Duplex
A building with two separate homes that share a wall.
Cul-de-sac
A dead-end street with a circular turnaround at the end.
Planning board resolution
The board's written decision, including any conditions the applicant must meet.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $3.4M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →