Commercial site plan on New Hampshire Ave

New Hampshire Avenue, Lakewood Township, NJ · 23,831 sq ft non-residential, retail & commercial · 1.9 acres

About this project

A commercial site plan for about 23,800 square feet on roughly 2 acres at New Hampshire Avenue in Lakewood Township, NJ.

Applicant
Red Porch Holdings, LLC
Engineer / designer
Newlines Engineering
Plan type
Site plan
Land use
Commercial
Status
Incomplete for Review

Filing history

  • 2025-12-17 · #LAT2219B · Site plan · 23,831 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

A commercial site plan has been filed for about 23,800 square feet of retail and commercial space on roughly 2 acres along New Hampshire Avenue in Lakewood Township, Ocean County. The county record doesn't say what is on the land now or who the tenants would be.

The developer is listed as Red Porch Holdings, LLC, with Newlines Engineering on the filing. Lakewood Planning Board hearing agendas from mid-2023 appear to list an application from the same developer on New Hampshire Avenue. It was for a retail building site plan. Those agendas were not read in full, so the match to the 2025 county filing is not confirmed.

No news coverage, opposition, approval decision or named occupant was found.

What it could mean nearby

Where it stands

A county planning filing was recorded on 2025-12-17. A decision by the township planning board was not found in public sources. A site plan usually goes through technical review, a public hearing, and then a written board resolution. Construction permits come after that.

Want to weigh in? The Lakewood Township Planning Board normally decides site plans at public hearings, where residents can comment. Hearing dates are posted on the township website, and the township clerk's office can answer questions.

Who's behind it

Red Porch Holdings, LLC

Around the web

Planning terms explained
Site plan
A detailed drawing showing where buildings, parking, driveways, lighting and drainage would go on a property.
Preliminary and final major site plan
A request for a board to approve the design and the final construction details in one step, used for larger projects.
Planning board
A local board that reviews development applications and decides whether they meet the town's rules.
Variance
Permission to depart from a zoning rule, such as a size, setback or parking requirement.
Resolution
The written record of a board's decision, including any conditions.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $4.8M