PlannedNearby

Ocean County · Manchester Township · #MT492C

Mixed-use site plan on South Hope Chapel Road

South Hope Chapel Road, Manchester Township, NJ · 43,200 sq ft non-residential, mixed use · 14.8 acres

About this project

A site plan for a mixed-use project on about 14.8 acres on South Hope Chapel Road in Manchester Township, Ocean County, NJ, with about 43,200 square feet of proposed space.

Official description: Mixed Use

Applicant
Hope Chapel Town Square, LLC
Engineer / designer
Professional Design Services, LLC
Plan type
Site plan
Land use
CR
Status
Approved with Contingency

Filing history

  • 2025-07-16 · #MT492C · Site plan · 43,200 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

A developer, Hope Chapel Town Square, LLC, wants to build a mixed-use project on about 14.8 acres along South Hope Chapel Road (County Road 547) in Manchester Township. County records list about 43,200 square feet of non-residential space. Township planning board records describe a mix of retail, office and residential uses.

The site is on the west side of the road, north of Ridgeway Road and close to the Jackson Township line. The records reviewed do not say what is on the land now.

The township planning board appears to have granted preliminary and final site plan approval in June 2025. Later agendas and minutes show a related application being carried to a later meeting. In March 2026 the board adopted amended resolutions for the project, including revised affordable housing wording. No news coverage, opposition or named tenants were found.

What it could mean nearby

Where it stands

The township planning board appears to have approved the site plan in 2025 and revised its resolutions in March 2026. Typically the next steps are permits from the county and state, then construction. The outcome of the later hearings could not be confirmed.

Want to weigh in? The Manchester Township Planning Board decides on this application. Its meetings are public and its agendas are posted on the township website.

Who's behind it

Hope Chapel Town Square, LLC

Around the web

Planning terms explained
Site plan
A detailed drawing showing where buildings, parking, driveways and utilities will go on a property.
Preliminary and final major site plan approval
A board approval that covers both the general design and the final details of a larger project.
Resolution
The board's written decision that records an approval and any conditions.
Mixed use
A project that combines different uses, such as shops, offices and homes.
Affordable housing
Homes set aside at restricted prices or rents for households with moderate or low incomes.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $11.2M