PlannedNearby

Ocean County · Stafford Township · #ST423K

School on Cedar Bridge Road

Cedar Bridge Road, Stafford Township, NJ · 17,225 sq ft non-residential, school · 6.4 acres

About this project

A site plan for a school of about 17,225 square feet on 6.36 acres on Cedar Bridge Road in Stafford Township.

Official description: School

Engineer / designer
Colliers Engineering & Design
Plan type
Site plan
Land use
P
Status
Approved with Contingency

Filing history

  • 2025-02-05 · #ST423K · Site plan · 17,225 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

County records show a site plan for a school of about 17,225 square feet on 6.36 acres along Cedar Bridge Road in Stafford Township, Ocean County. That is a fairly small school building, roughly the size of a large single-story office or a small elementary wing, on a lot of a little over six acres.

The records don't say who would run the school, what grades it would serve, or what is on the land now. The only firm named on the filing is Colliers Engineering & Design, an engineering firm that prepares site plans. It is not necessarily the developer or the school operator.

A web search found no news coverage, township meeting agendas or minutes, or developer pages clearly tied to this project. Nothing was found about opposition or approvals.

What it could mean nearby

Where it stands

The latest county filing, dated 2025-02-05, is a site plan. No township approval or hearing result was found online. A site plan usually goes to the local planning board for review at a public hearing, and the county reviews it separately. Approval often comes with conditions on traffic, drainage and landscaping.

Want to weigh in? The Stafford Township planning board would normally review a site plan like this, and residents can usually comment at its public meetings. Hearing notices are typically mailed to nearby property owners and posted by the township.

Planning terms explained
Site plan
A detailed drawing showing where buildings, parking, driveways, drainage and landscaping would go on a property.
Planning board
A local volunteer board that reviews development applications and decides whether they meet township rules.
Non-residential square footage
The total floor area of buildings that are not homes, such as schools, offices or stores.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $6.0M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →