PlannedNearby

Ocean County · Toms River Township · #TRT3080A.04

Mixed use building at West Water & Iron Streets

West Water Street & Iron Street, Toms River Township, NJ · 81,619 sq ft non-residential, mixed use · 3.6 acres

About this project

A site plan for a mixed-use building at West Water Street and Iron Street in Toms River Township, about 81,619 sq ft on 3.6 acres.

Official description: MIxed Use Building

Applicant
Meridia Toms River 40 Urban Renewal, LLC
Engineer / designer
Dynamic Engineering Consultants, PC
Plan type
Site plan
Land use
CR
Status
Approved with Contingency

Filing history

  • 2024-06-19 · #TRT3080A.04 · Site plan · 81,619 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

The project is a six-story mixed-use building at West Water and Irons Streets in downtown Toms River, on about 3.6 acres. County records list roughly 81,619 sq ft of non-residential space. Press coverage describes the building as mostly apartments with ground-floor shops.

The first plan, approved in December 2021, had two 10-story towers. After the township and developer agreed to a lower design, the planning board approved a revised six-story version in October 2023. That version has about 281 apartments, around 14,700 sq ft of retail, and a two-story parking deck with 389 spaces. It also has an outdoor amphitheater and an elevated boardwalk.

The site was described as a downtown parking lot. The latest county filing, in June 2024, is a site plan for the project. No news was found about a tenant for the retail space.

What it could mean nearby

Where it stands

The planning board approved the revised site plan in October 2023, and a further site plan was filed with the county in June 2024. Next usually come final permits, then construction. No later approval or construction news was found.

Who's behind it

Meridia Toms River 40 Urban Renewal, LLC · A single-project company tied to the Meridia apartment brand of Capodagli Property Company, which builds apartment communities in New Jersey.

Around the web

Planning terms explained
Site plan
A detailed drawing of how a property will be laid out, including buildings, parking and access.
Variance
Permission to depart from a zoning or redevelopment rule, such as a required setback.
Setback
The minimum distance a building must sit back from the street.
Redeveloper agreement
A contract between a township and a developer for building on land in a designated redevelopment area.
Urban renewal entity
A company formed to carry out one redevelopment project.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Toms River Planning Board would hear any further site plan changes at public meetings, where residents may comment.

In New Jersey, the Toms River Township planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find Toms River Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $21.2M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →