PlannedNearby

Ocean County · Toms River Township · #TRT3561

13-lot subdivision with 12 homes on Church Road

Church Road, Toms River Township, NJ · 12 homes, single-family homes · 15.3 acres

About this project

A major subdivision of 13 lots on about 15.3 acres on Church Road in Toms River Township, NJ, with 12 single-family dwellings and one basin lot.

Official description: 13-lot residential subdivision (12 single-family dwellings & 1 basin lot)

Applicant
1556 Church Road, LLC
Engineer / designer
Morgan Engineering & Surveying
Plan type
Major preliminary & final
Land use
Residential
Status
Incomplete for Review

Filing history

  • 2025-12-17 · #TRT3561 · Major preliminary & final

County plan review office →

The full picture AI research · Nov 1, 2026

The developer proposes to divide a Church Road property in Toms River into 13 lots. Twelve lots would get single-family homes, and the 13th would hold a stormwater basin. County records give the site as about 15.3 acres. The property is a farm. It sits roughly between the Garden State Parkway overpass and North Dover Elementary School.

Local news coverage from March 2026 says the application asks the township board for several variances. A variance is permission to depart from a zoning rule. One example is a lot only about 154 feet deep where 200 feet is normally required. The developer also asked for street lights mounted lower than the code normally allows.

No coverage of a hearing, vote or approval was found. The news report describes a 12-lot plan, and the county filing shows 13 lots because the basin counts as one.

What it could mean nearby

Where it stands

The latest county filing is dated 2025-12-17, and a news report in March 2026 described the application as pending before the township board. No decision was found. Typically the board holds a public hearing, votes on the variances and subdivision, and then the developer needs final approval and construction permits.

Want to weigh in? The Toms River Township planning or zoning board that hears the application decides next, and residents can usually comment at its public hearing. Check the township's meeting agendas for the date.

Who's behind it

1556 Church Road, LLC · A property-owning company for this site, with Morgan Engineering & Surveying listed on the filing as the engineering and surveying firm.

Around the web

Planning terms explained
Major subdivision
The division of a larger property into several new lots, which needs formal board review and a public hearing.
Variance
Permission to depart from a zoning rule, such as a minimum lot depth.
Basin lot
A lot set aside for a stormwater basin that holds and slowly releases runoff.
Lot depth
The distance from the front of a lot at the street to its back boundary.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $6.7M