PlannedNearby

Philadelphia · West Kensington · #ZP-2025-000645

2034 N 2nd St

2034 N 2Nd St, West Kensington, PA · 4 homes, mixed use

About this project

Conversion of four second-floor artisan studio and industrial spaces into four residential units at 2034 N 2nd St, raising the building's total from 40 to 44 units. The ground-floor industrial spaces stay as approved.

Official description: Permit applicaiton is for the conversion of four (4) artisan studios and artisan industrial spaces on the second floor to four (4) residential dwelling units in an existing structure. Total number of dwelling units in the structure shall increase from forty (40) to forty-four (44), with existing ground floor industrial spaces to remain as previously approved

Applicant
GOTHAM NORTH LP
Plan type
Zoning Board appeal (Variance)
Status
Zoning Board: Complete

Filing history

  • 2025-02-06 · #ZP-2025-000645 · Zoning Board appeal (Variance) · 4 lots/units

City property record, permits and appeals (Atlas) →

The full picture AI research · Nov 1, 2026

The county record describes a small change to an existing building at 2034 N 2nd St in West Kensington, Philadelphia. The owner wants to turn four second-floor spaces into four apartments. Those spaces were approved as artisan studios and light-industrial space. The building's total would go from 40 to 44 apartments.

The ground-floor industrial spaces stay as approved, so the building remains mixed use.

Public reporting from 2023 describes the building as a six-story rental building with 40 apartments. It has artist and artisan studio space on the lower floors, plus a small ground-floor parking garage. No news coverage, hearing notice or opposition was found for the 2025 conversion itself.

What it could mean nearby

Where it stands

The latest county filing, dated 2025-02-06, shows the change to 44 units has been filed. The records reviewed do not show whether it has been approved. Philadelphia applications like this are normally reviewed by the city's licensing and zoning staff. If the use change needs a variance, the zoning board holds a hearing first.

Want to weigh in? If a zoning board hearing is needed, nearby residents can usually comment at that hearing. The city posts hearing notices, and a notice is usually placed on the property.

Who's behind it

Gotham North LP · The county filing names this firm. A 2023 news report named a similarly titled owner, Gotham Tower LP. No company website was found.

Around the web

Planning terms explained
Mixed use
A building that combines different uses, such as homes and workshops or shops.
Artisan industrial space
Small workshop space for making goods by hand or in small batches.
Zoning variance
Special permission to use a property in a way the zoning rules do not normally allow.
Conversion
Changing how part of an existing building is used without building a new one.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $2.2M