PlannedNearby

Kent County · Harrington · #2026-02-08

EZ Work Trucks repair facility

17439 S DuPont Hwy, Harrington, DE 19952, Harrington, DE · 98,000 sq ft non-residential, industrial · 16.0 acres

About this project

A 98,000-square-foot commercial vehicle repair facility with service bays, offices, parking and stormwater facilities on about 16 acres at 17439 S DuPont Hwy in Harrington.

Official description: The applicant proposes the development of a 98,000 square foot commercial vehicle repair facility including truck service bays, administrative offices, access drives, parking, stormwater management facilities, and utility connections.

Owner
Dover Land Holdings, LLC
Engineer / designer
Dave Heatwole
Plan type
Site Plan Review
Land use
Warehousing and Motor Vehicle Repair and Storage
Zoning
M - Manufacturing & C-3 Service Commercial → M - Manufacturing & C-3 Service Commercial
Sewer
Municipal
Status
Complete

Filing history

  • 2026-02-01 · #2026-02-08 · Site Plan Review

State agencies' comment letter (PDF) →

PLUS application (PDF) →

The full picture AI research · Nov 1, 2026

A commercial vehicle repair facility is proposed at 17439 S DuPont Hwy in Harrington, Kent County. County records describe a building of about 98,000 square feet with service bays, offices, parking and stormwater facilities. It would sit on roughly 16 acres and is classed as industrial use.

The filings list Dover Land Holdings, LLC as one of the firms involved. The most recent county filing is dated February 2026. The records do not say what is on the site now.

Online searches found no news coverage, meeting agendas, hearing notices or approvals for this project. The name matches a used-truck seller in Harrington that is listed at a nearby address on the same highway. No source confirms that this company will occupy the new facility.

What it could mean nearby

Where it stands

The latest county filing is from February 2026. No approvals or hearings were found online. Projects like this usually go through site plan review and state and local permits before construction.

Want to weigh in? No hearing was found. Residents can ask the City of Harrington or Kent County planning offices which body reviews the site plan and when comments are taken.

Planning terms explained
Site plan
A detailed drawing showing where buildings, parking, driveways and utilities will go on a property.
Stormwater facilities
Basins or other systems that collect and slow rain runoff so it does not flood neighboring land.
Industrial use
A land-use category for activities such as repair, manufacturing or storage, which is often more intensive than retail or office use.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $12.7M