Schuylkill County · Cass Township · #05-08-0054000 · Solar farms tracker
Ground-mount solar array at 40 High School Lane
40 High School Lane, Cass Township, PA · 80,000 sq ft non-residential, school
In short: Ground-mount solar array at 40 High School Lane is a school project in Cass Township, Schuylkill County, PA. It would add 80,000 sq ft of non-residential space. Its estimated construction value is about $16.0M, a rough estimate from its size. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: Construction stormwater permit PAC540189 issued (October 17, 2026). What usually happens next: site work and construction.
Usually next: site work and construction.
About this project
A ground-mounted solar array and related improvements on the Minersville Area School District campus. The plan lists about 80,000 square feet of area and is in the IST Institutional zone.
Issues raised: Waiver request needs hardship statement and minimum modification, Owner signatures and notarization missing, UPI certification required before recording
- Applicant
- Quandel Construction Group LLC
- Plan type
- Preliminary/final land development
- Land use
- other
- Zoning
- IST Institutional District
The full picture AI research · Nov 18, 2026
The Minersville Area School District plans a solar project at its campus at 40 High School Lane in Cass Township. County records describe a ground-mounted solar array and related site work covering about 80,000 square feet. The land is zoned Institutional.
Online coverage from spring 2026 describes a roughly $6.5 million contract for solar panels and roof repairs at the high school. The contractor is Quandel Energy Solutions, working under Pennsylvania's Guaranteed Energy Savings Act. That law lets a district pay for upgrades from the energy savings they produce. The coverage describes about 1 megawatt of solar, with panels on the roof and on about 2 acres of land. The district expects tax credits and a state grant to offset the cost.
No news of construction progress was found. The utility is expected to connect the system in May 2027.
What it could mean nearby
- The array sits on an existing school campus in an institutional zone, so no new homes are involved.
- Construction traffic is likely to be limited to the school campus and its access road. The records don't describe a traffic study.
- The district expects lower energy costs and roof repairs at the high school, according to local coverage.
Where it stands
A construction stormwater permit was issued on 2026-10-17, after the county planning commission reviewed the land development plan in August 2026. The township supervisors' 2026-10-27 agenda lists a planning commission and engineer report. Site work, then utility interconnection (expected May 2027), usually follow.
- May 2027 Utility interconnection and system start-up expected, per local news
- Oct 27, 2026 Cass Township supervisors' agenda lists a planning commission and engineer report
- Oct 17, 2026 Construction stormwater permit PAC540189 issued
- Aug 3, 2026 County planning commission reviewed the land development plan
- Mar 2026 School board approved the roughly $6.5 million solar and roofing contract (reported March 2026)
Who's behind it
Quandel Construction Group LLC · A construction firm named on the filing. Local coverage names a related company, Quandel Energy Solutions, as the energy contractor on the school project. How the two companies are related was not confirmed.
Around the web
- Minersville Area High School solar and roof projectCoal Region Canary · Mar 28, 2026Reports the school board approved a $6.5 million solar and roof project, with summer 2026 construction and a May 2027 start-up.
- Minersville board approves $6.495 million solar and roofing GESA projectCitizen Portal · Mar 1, 2026Summarizes the board vote on the contract with Quandel Energy Solutions for roof and ground solar arrays, and an interconnection agreement. The page itself could not be opened, so this relies on a search-result summary.
- Pennsylvania Bulletin notice, construction stormwater permitPennsylvania Bulletin · Oct 17, 2026Shows the stormwater permit was issued.
- Cass Township supervisors meeting agenda, 2026-10-27Cass Township · Oct 27, 2026Lists a planning commission and engineer report. The file is a scanned image and could not be read, so its contents on this project are unknown.
Planning terms explained
- Land development
- A formal plan for building or changing a site, reviewed by the township and county.
- Construction stormwater permit
- A state permit that requires erosion and runoff controls during earth-moving work.
- GESA
- The Guaranteed Energy Savings Act, a state law that lets schools pay for upgrades from their energy savings.
- IST Institutional zone
- A zoning district for schools and similar public or institutional uses.
- Interconnection
- The utility's connection of a solar system to the power grid.
Researched by AI from public sources on Nov 18, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Cass Township supervisors and the Minersville Area School Board handle local matters, and residents can comment at their public meetings.
In Pennsylvania, Cass Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Cass Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Cass Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Cass Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $16.0M
- ~800 roofing squares (assumes 1 story)
- ~200 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Lot #3 minor subdivision, Highridge Business Parksame area · subdivision (use not stated) · Cass Township · filed 2024-07-10
- Quandel Concrete minor subdivision, Cass Townshipsame area · subdivision (use not stated) · Cass Township · filed 2024-09-11
- Lot 3B land development, Cass Townshipsame area · other · Cass Township · filed 2024-07-10
- Rooftop solar system, Cass Townshipsame area · other · Cass Township · filed 2026-05-13
- Major subdivision lot annexation, Cass Townshipsame area · lot line change · Cass Township · filed 2025-09-10
- Lot 3 minor subdivision, Highridge Business Parksame area · subdivision (use not stated) · Cass Township · filed 2024-06-12