In short: **Major subdivision conditional final extension** is a subdivision in Union Township, Schuylkill County, PA. As of November 24, 2026, it is approved. Latest record: Time extension for conditional final approval approved (June 12, 2024). What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Stage: Approved · Time extension for conditional final approval approved · Jun 12, 2024 · [source](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

## About this project

The commission extended conditional final approval of a major subdivision in Union Township until the October 9, 2024 meeting, after an earlier extension to June 12, 2024. The agenda gives no other project details.

- **Plan type:** Time extension for conditional final approval
- **Land use:** other

## Project history

- **2024-06-12** · #2024-06-major-subdivision-conditional-final-exte · Time extension for conditional final approval

[County plan review office →](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Map pin is approximate.

## The full picture AI research · Nov 16, 2026

The Schuylkill County Planning Commission extended its conditional final approval for a major subdivision in Union Township. A subdivision splits a larger piece of land into separate lots. The extension ran until the commission's October 9, 2024 meeting. An earlier extension had run to June 12, 2024.

The agenda does not give the developer, the location, the number of lots, or whether homes or another use are planned. Conditional approval means the plan is accepted, but the applicant still has to meet listed conditions. Those are often outside permits or sewage and stormwater sign-offs.

No developer page, news story, listing, permit, or sign of construction was found for this project. Nothing online ties it to a particular site.

### What it could mean nearby

- The records do not give lot count, use, or location, so the effect on traffic, schools, or utilities cannot be judged.
- Repeated extensions suggest the applicant was still working through approval conditions, and no construction is shown.

### Where it stands

As of June 12, 2024, the plan had conditional final approval with the deadline extended to October 9, 2024. No later record was found. Normally the applicant meets the conditions and the plan is then finalized and recorded, or it asks for another extension.

- **Oct 9, 2024** Extended deadline for meeting the conditions of final approval
- **Jun 12, 2024** Planning commission extended conditional final approval to the October 9, 2024 meeting

### Around the web

- [Planning Commission Meetings](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php) — Schuylkill County, PA · Jun 12, 2024This is the county record of the June 12, 2024 extension. The page lists meeting documents only and shows no project details.

Planning terms explained

- **Major subdivision:** A division of land into several lots, which usually involves new streets or utilities and a fuller review than a small split.
- **Conditional final approval:** Approval that takes effect only after the applicant meets listed conditions, such as permits or corrections to the plans.
- **Time extension:** More time granted to meet the conditions before the approval lapses.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 16, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Schuylkill County Planning Commission reviews the plan at its public monthly meetings, and the Union Township supervisors can also be contacted.

In Pennsylvania, Union Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Union Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Union Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Union Township's meeting agendas →](https://www.google.com/search?q=Union+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Minor final subdivision in Union Township](https://plannednearby.com/x/schuylkill-minor-final-subdivision-in-union-townshi-2246d3) — same area · lot line change · Union Township · filed 2025-09-10
- [Solar sketch plan, Union Township](https://plannednearby.com/x/schuylkill-2025-02-solar-sketch-plan-union-township) — same area · other · Union Township · filed 2025-02-12
- [Minor subdivision prelim/final ext., Union Twp](https://plannednearby.com/x/schuylkill-minor-subdivision-prelim-final-ext-union-19f49d) — same area · subdivision (use not stated) · Union Township · filed 2025-05-14
- [Final survey plan, Union Township](https://plannednearby.com/x/schuylkill-2025-09-final-survey-plan-union-township) — same area · other · Union Township · filed 2025-09-10
- [Final minor subdivision, Union Township](https://plannednearby.com/x/schuylkill-2025-09-final-minor-subdivision-union-township) — same area · subdivision (use not stated) · Union Township · filed 2025-09-10
- [Major subdivision, Union Township](https://plannednearby.com/x/schuylkill-2024-07-major-subdivision-union-township) — same area · subdivision (use not stated) · Union Township · filed 2024-07-10

[See everything nearby on a map →](https://plannednearby.com/near#40.85319,-76.23361,Union%20Township)

---

Source page: https://plannednearby.com/x/schuylkill-2024-06-major-subdivision-conditional-final-exte

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.