[Schuylkill County](https://plannednearby.com/c/schuylkill-pa/) · [East Union Township](https://plannednearby.com/c/schuylkill-pa/east-union-township) · #2024-07-lot-57-b-humbolt-industrial-park

# Lot 57-B, Humbolt Industrial Park

Lot 57-B, Humbolt Industrial Park, East Union Township, PA · industrial

In short: **Lot 57-B, Humbolt Industrial Park** is an industrial development in East Union Township, Schuylkill County, PA. As of November 24, 2026, the public records we track show nothing newer since July 15, 2024. The town may have acted since.

Stage: No recent records · Latest record we have · Jul 15, 2024

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

## About this project

Preliminary and final land development plans for Lot 57-B of the Humbolt Industrial Park in East Union Township, reviewed by county staff. The agenda gives no building size or site details.

- **Plan type:** Preliminary/final land development plan
- **Land use:** industrial

## Project history

- **2024-07-15** · #2024-07-lot-57-b-humbolt-industrial-park · Preliminary/final land development plan

[County plan review office →](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Map pin is approximate.

## The full picture AI research · Nov 16, 2026

County planning staff reviewed preliminary and final land development plans for Lot 57-B of the Humbolt Industrial Park in July 2024. The agenda gave no building size or site details. The county listing places the lot in East Union Township.

A lot with the same label, Parcel 57B at 620 Oak Ridge Road, appears in the park's marketing. Mericle's flyer and the Can Do economic development agency's page describe a 248,000-square-foot single-tenant warehouse on about 21 acres. Both pages place it in Hazle Township. A trade-press headline says Mericle finished a bulk warehouse in the park, and the listings were still offering the building for lease. No tenant was found.

The match is likely but not certain, because the listings name a different township than the county does. No news, township minutes or state permit pages were found that tie the county filing to this building.

### What it could mean nearby

- Warehouse use of this kind usually brings truck traffic. The records reviewed give no traffic study for this lot.
- The building is marketed as a lease opportunity. Job numbers depend on the eventual tenant, who was not found.
- The lot sits inside an established industrial park near I-80 and I-81, so it is not next to new housing.

### Where it stands

The latest county record is the July 15, 2024 planning commission review of the land development plan. The listings suggest a warehouse on a similarly labeled lot was built and marketed in 2025, but they are in a different township, so this is not confirmed. Note: Marketing pages for Parcel 57B at 620 Oak Ridge Road list Hazle Township, while the county record lists Lot 57-B in East Union Township, so the two may not be the same site.

- **Jul 15, 2024** County planning commission reviewed the preliminary/final land development plan for Lot 57-B

### Who's behind it

Mericle (marketing the 620 Oak Ridge Road building; link to this lot unconfirmed) · A commercial real estate developer that builds and leases industrial buildings in the Humboldt Industrial Park, which Can Do, Inc. developed.

### Around the web

- [Planning Commission Meetings](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php) — Schuylkill County · Jul 15, 2024Lists the July 15, 2024 regular meeting, but the page text gives no details on Lot 57-B.
- [620 Oak Ridge Road – Parcel 57B](https://hazletoncando.com/properties/620-oak-ridge-road-parcel-57b/) — Can Do, Inc.Lists a 248,000 sq ft building on 20.98 acres, available, in Hazle Township, in the Opportunity Zone.
- [Mericle wraps construction on new bulk warehouse in the Humboldt Industrial Park](https://www.costar.com/article/767147160/mericle-wraps-construction-on-new-bulk-warehouse-in-the-humboldt-industrial-park) — CoStarOnly the headline and search summary were read, since the page was blocked. They report that Mericle finished a warehouse in the park; whether it is Parcel 57B is unconfirmed.
- [620 Oak Ridge Road lease listing](https://www.crexi.com/lease/properties/880979/pennsylvania-620-oak-ridge-road) — CrexiShows the building still marketed for lease. Only the search summary was read.

Planning terms explained

- **Land development plan:** A site plan showing buildings, parking, roads and drainage on a lot, which the municipality reviews before work starts.
- **Preliminary/final plan:** A combined review that skips the usual two separate steps.
- **Industrial park:** A zoned area set aside for warehouses, factories and similar businesses.
- **LERTA:** A local program that temporarily abates property taxes on new improvements to encourage development.

Researched by AI from public sources on Nov 16, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The county planning commission reviewed the plan, and the township's own approval and meetings decide local matters. Residents can comment at East Union Township meetings.

In Pennsylvania, East Union Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the East Union Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the East Union Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find East Union Township's meeting agendas →](https://www.google.com/search?q=East+Union+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Mar-Mel minor subdivision and land dev., East Union Twp](https://plannednearby.com/x/schuylkill-mar-mel-minor-subdivision-and-land-dev-e-93bdb4) — same area · subdivision (use not stated) · East Union Township · filed 2025-11-12
- [Lot annexation and minor subdivision, East Union Twp](https://plannednearby.com/x/schuylkill-lot-annexation-and-minor-subdivision-eas-ec658a) — same area · lot line change · East Union Township · filed 2024-09-11
- [Land development plan in East Union Township](https://plannednearby.com/x/schuylkill-land-development-plan-in-east-union-town-cbfc3c) — same area · government & utilities · East Union Township · filed 2026-06-10
- [Lot annexation and minor subdivision on Iron St](https://plannednearby.com/x/schuylkill-lot-annexation-and-minor-subdivision-on-6b3730) — same area · lot line change · East Union Township · filed 2024-08-19
- [Utility service building lot, East Union Twp](https://plannednearby.com/x/schuylkill-utility-service-building-lot-east-union-93bdb4) — same area · 19,177 sq ft non-residential, government & utilities · East Union Township · filed 2025-10-30
- [Lot consolidation, West Players Way](https://plannednearby.com/x/schuylkill-lot-consolidation-west-players-way-fe0b50) — same area · lot line change · East Union Township · filed 2026-10-02

[See everything nearby on a map →](https://plannednearby.com/near#40.88357,-76.14265,East%20Union%20Township)

---

Source page: https://plannednearby.com/x/schuylkill-2024-07-lot-57-b-humbolt-industrial-park

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
