[Schuylkill County](https://plannednearby.com/c/schuylkill-pa/) · [Washington Township](https://plannednearby.com/c/schuylkill-pa/washington-township) · #2024-07-sketch-plan-for-septic-easement-washingt

# Sketch plan for septic easement, Washington Township

Washington Township, PA · lot line change

In short: **Sketch plan for septic easement, Washington Township** is a lot line change in Washington Township, Schuylkill County, PA. As of November 24, 2026, the public records we track show nothing newer since July 15, 2024. The town may have acted since.

Stage: No recent records · Latest record we have · Jul 15, 2024

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

## About this project

Sketch plan to allow a septic system for an existing home on a non-conforming lot. A 16.5-foot strip owned by a neighbor separates the parcels, so a permanent sanitary easement across it is being sought, which the neighbor has verbally agreed to.

Issues raised: Non-conforming lot with no room for septic, Perc tests cross the property line, Permanent sanitary easement needed across neighboring strip, Strip not shown on county parcel locator

- **Plan type:** Sketch plan
- **Land use:** lot-line-change

## Project history

- **2024-07-15** · #2024-07-sketch-plan-for-septic-easement-washingt · Sketch plan

[County plan review office →](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Map pin is approximate.

## The full picture AI research · Nov 16, 2026

A property owner wants to install a septic system for an existing house on a lot that is too small or oddly shaped to meet current rules. A survey found a 16.5-foot strip of land owned by a neighbor between the house lot and the land where the septic system would go. The owner therefore wants a permanent sanitary easement across the strip. An easement is a legal right to use someone else's land for a set purpose. The neighbor has agreed to this verbally.

No new buildings are proposed. The county planning commission minutes for July 2024 describe the plan as a sketch plan involving a lot line change. The plan would create a separate parcel to hold the septic system. The commission was reported to have no objection to the plan. It asked that the easement cover the whole area of the neighbor's land between the house lot and the new parcel. No news coverage, developer website, listing or construction record was found for the site.

### What it could mean nearby

- No new homes, businesses or traffic are proposed, because the plan only supports septic service for an existing home.
- The neighbor's strip of land would be permanently burdened by a sanitary easement, so the legal paperwork matters for both owners.
- Test results for the septic system were reportedly taken before the boundary survey and fell over the property line, which is why the easement was needed.

### Where it stands

The plan was at the informal sketch stage when the county planning commission reviewed it on 2024-07-15, and no later filings turned up. The usual next steps are a formal subdivision or lot line plan, a signed and recorded easement, and approval of the septic design.

- **Jul 15, 2024** Sketch plan reviewed by the Schuylkill County Planning Commission, which asked for an easement covering the full strip

### Around the web

- [Schuylkill County Planning Commission Minutes, July 2024](https://cms8.revize.com/revize/schuylkillcountypa/Document_Center/Agenda%20&%20minutes/Planning%20Commission%20Meetings/2024/Minutes/Minutes%202024%207.pdf) — Schuylkill County · Jul 15, 2024The minutes, as summarized in search results (the PDF itself could not be read directly), describe the 16.5-foot strip, the neighbor's verbal agreement, and the commission's request that the easement cover the whole area between the lots.
- [Planning Commission Meetings](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php) — Schuylkill CountyLists the 2024-07-15 regular meeting with its agenda, packet and minutes.

Planning terms explained

- **Sketch plan:** An early, informal drawing shown to planners for feedback before a formal application.
- **Lot line change:** Moving the boundary between neighboring parcels without creating a new building lot.
- **Sanitary easement:** A legal right to put a septic system or sewage lines on land that belongs to someone else.
- **Non-conforming lot:** A lot that does not meet today's size or shape rules but was legal when created.

Researched by AI from public sources on Nov 16, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** A formal plan would go to the Washington Township supervisors and the Schuylkill County Planning Commission, whose meetings are listed on the county planning commission page, but no hearing is scheduled in the records found.

In Pennsylvania, Washington Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Washington Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Washington Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Washington Township's meeting agendas →](https://www.google.com/search?q=Washington+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Ag operation land development, Washington Twp](https://plannednearby.com/x/schuylkill-710) — same area · agricultural · Washington Township · filed 2026-03-11
- [Three-parcel annexation plan, Washington Township](https://plannednearby.com/x/schuylkill-three-parcel-annexation-plan-washington-e439ea) — same area · lot line change · Washington Township · filed 2026-06-10
- [Subdivision plan, Washington Township (extension)](https://plannednearby.com/x/schuylkill-2024-11-subdivision-plan-washington-township-ext) — same area · subdivision (use not stated) · Washington Township · filed 2024-11-13
- [CVE solar project, Washington Township](https://plannednearby.com/x/schuylkill-cve-solar-project-washington-township-9d14ea) — same area · other · Washington Township · filed 2025-10-28
- [Final annexation plan, Washington Township](https://plannednearby.com/x/schuylkill-33-15-008500033-15-008800033-15-0091000) — same area · lot line change · Washington Township · filed 2026-05-13
- [Annexation plan, Washington Township](https://plannednearby.com/x/schuylkill-2026-02-annexation-plan-washington-township) — same area · lot line change · Washington Township · filed 2026-02-11

[See everything nearby on a map →](https://plannednearby.com/near#40.55077,-76.31011,Washington%20Township)

---

Source page: https://plannednearby.com/x/schuylkill-2024-07-sketch-plan-for-septic-easement-washingt

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
