[Schuylkill County](https://plannednearby.com/c/schuylkill-pa/) · [Cass Township](https://plannednearby.com/c/schuylkill-pa/cass-township) · #2024-10-solar-project-land-development-cass-town · [Solar farms tracker](https://plannednearby.com/topics/solar-farms/)

# Solar project land development, Cass Township

Cass Township, PA · other

In short: **Solar project land development, Cass Township** is a development project in Cass Township, Schuylkill County, PA. As of November 24, 2026, the public records we track show nothing newer since October 9, 2024. The town may have acted since.

Stage: No recent records · Latest record we have · Oct 9, 2024

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

## About this project

Solar project preliminary/final land development plan in Cass Township, reviewed by county staff. The agenda gives no size or site details.

- **Plan type:** Preliminary/final land development
- **Land use:** other

## Project history

- **2024-10-09** · #2024-10-solar-project-land-development-cass-town · Preliminary/final land development

[County plan review office →](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Map pin is approximate.

## The full picture AI research · Nov 15, 2026

A solar project in Cass Township, Schuylkill County, went to the county planning commission for review of a combined preliminary and final land development plan on October 9, 2024. The agenda gives no acreage, power output or street location, and no other record was found that adds them.

A 2023 regional news article says a Pottsville coal company, Reading Anthracite Co., planned solar arrays on former mining land in several townships, Cass among them. That article gives no site, size or status for Cass. It is not confirmed to be this same project, so this page treats the link as possible only.

No construction, listing, business opening or permit notice was found for a Cass Township solar site. What is on the ground today is unknown.

### What it could mean nearby

- Solar arrays usually produce little traffic once running, but the records here give no traffic or access details.
- The records give no site size, so effects on open space, jobs, schools or utilities cannot be stated.

### Where it stands

The county planning commission reviewed a preliminary/final land development plan on 2024-10-09. No later approval, permit or construction record was found, so the current stage is unclear. A township approval, then building and stormwater permits, would usually follow.

- **Oct 9, 2024** County planning commission reviewed the preliminary/final land development plan
- **Oct 28, 2023** Regional news article said Reading Anthracite planned solar arrays on former mining land in several townships, including Cass

### Who's behind it

[Reading Anthracite Co. (possible, unconfirmed for this plan)](https://readinganthracite.com/) · A Pottsville-based coal products company that has said it plans solar arrays on its former mining land.

### Around the web

- [Planning Commission Meetings](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php) — Schuylkill County · Oct 9, 2024Lists the 10/09/24 regular meeting at which the plan was reviewed, with no applicant, size or site details on the page.
- [Schuylkill County's solar surge: 8 projects proposed on coal lands, farm fields](https://www.yahoo.com/news/schuylkill-countys-solar-surge-8-035900173.html) — Republican & Herald via Yahoo News · Oct 29, 2023Says Reading Anthracite planned solar arrays on former mining land in six townships including Cass, with no Cass-specific size or status.
- [Planning Commission](https://casstownship.org/services/planning-commission) — Cass TownshipSays the township planning commission reviews plans to develop or divide land.

Planning terms explained

- **Land development plan:** A detailed site plan for building on a parcel, covering layout, drainage, access and similar items.
- **Preliminary/final plan:** A single submission that asks for both the early and the last round of plan approval together.
- **County planning commission:** An advisory body that reviews local plans and sends comments, while the township makes the decision.
- **Stormwater permit:** State approval of how rain runoff will be managed during and after construction.

Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Cass Township supervisors and planning commission handle land development approvals locally, and residents can comment at their public meetings listed on casstownship.org.

In Pennsylvania, Cass Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Cass Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Cass Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Cass Township's meeting agendas →](https://www.google.com/search?q=Cass+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Service plaza lot 3 subdivision, Cass Township](https://plannednearby.com/x/schuylkill-service-plaza-lot-3-subdivision-cass-tow-f24ec6) — same area · subdivision (use not stated) · Cass Township · filed 2024-09-11
- [Truck repair facility lot consolidation and land development](https://plannednearby.com/x/schuylkill-truck-repair-facility-lot-consolidation-d57ba9) — same area · industrial · Cass Township · filed 2024-03-13
- [Solar project land development, Cass Township](https://plannednearby.com/x/schuylkill-2024-11-solar-project-land-development-cass-town) — same area · other · Cass Township · filed 2024-11-13
- [Highridge Park Service Plaza Lot 3 subdivision](https://plannednearby.com/x/schuylkill-highridge-park-service-plaza-lot-3-subdi-f24ec6) — same area · recreation · Cass Township · filed 2024-08-12
- [Preliminary/final land development, Cass Township](https://plannednearby.com/x/schuylkill-preliminary-final-land-development-cass-776177) — same area · other · Cass Township · filed 2024-06-12
- [Minor subdivision and annexation, Cass Township](https://plannednearby.com/x/schuylkill-minor-subdivision-and-annexation-cass-to-16421d) — same area · lot line change · Cass Township · filed 2024-11-20

[See everything nearby on a map →](https://plannednearby.com/near#40.70417,-76.28000,Cass%20Township)

---

Source page: https://plannednearby.com/x/schuylkill-2024-10-solar-project-land-development-cass-town

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
