Schuylkill County · Cass Township · #2024-11-quandel-concrete-new-plant-cass-township
Quandel Concrete new plant, Cass Township
Cass Township, PA · industrial
In short: Quandel Concrete new plant, Cass Township is an industrial development in Cass Township, Schuylkill County, PA. As of November 24, 2026, the public records we track show nothing newer since November 13, 2024. The town may have acted since.
The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.
About this project
Plan for a new Quandel Concrete plant, an office building, and a vehicle maintenance building in Cass Township. The agenda gives no site size or location details.
- Plan type
- Land development
- Land use
- industrial
Project history
- 2024-11-13 · #2024-11-quandel-concrete-new-plant-cass-township · Land development
Map pin is approximate.
The full picture AI research · Nov 19, 2026
Quandel Concrete, a ready-mix concrete company, has a plan for a new concrete plant, an office building and a vehicle maintenance building in Cass Township, near Minersville. The county planning commission reviewed the land development plan on 2024-11-13. The county agenda gives no site size or location.
Other sources place the company's Cass Township plant at 9 Schaeffer Hill Road. A 2023 sketch plan showed about 9,200 square feet of buildings in total: a garage, an office and operations space, and a plant enclosure. The 2024 floor area was not verified. A fire damaged the existing plant in January 2023, and the owners said they planned to rebuild. In 2026 the company merged with a Lebanon County concrete firm to form BQ Concrete. News coverage of the merger describes the Cass Township plant as operating. No source was found showing the new plant built or under construction.
What it could mean nearby
- Concrete trucks already use the Schaeffer Hill Road site, so truck traffic is the main thing neighbors would notice. No traffic study was found.
- Reports on the merger say the Cass Township operation continues, which suggests local jobs are kept. No new job count was found.
- No records were found on stormwater, noise or dust for the new plant.
Where it stands
The county planning commission reviewed the land development plan on 2024-11-13, and no later county record was found. A township or county approval and then building and stormwater permits would normally follow, but no source shows that any of these happened. Note: News coverage of the 2026 merger describes the existing Cass Township plant as operating, but it does not mention the new plant, so it does not show whether the 2024 plan was built.
- Mar 12, 2026 News reports Quandel merged with a Lebanon County firm to form BQ Concrete and lists the Cass Township plant as operating
- Nov 13, 2024 County planning commission reviewed the land development plan for the new plant, office and maintenance building
- Jun 2023 Sketch plan for the garage, office and plant enclosure appeared on the county planning agenda
- Jan 3, 2023 Fire damaged the existing Quandel plant in Cass Township; owners said they planned to rebuild
Who's behind it
Quandel Concrete (now part of BQ Concrete, Byler Materials Group) · A family-founded ready-mix concrete company, established in 1946, that also makes colored concrete and retaining wall blocks, and merged in 2026 with a Lebanon County concrete firm.
Around the web
- Planning Commission MeetingsSchuylkill County · Nov 13, 2024Shows the land development plan reviewed on 2024-11-13.
- June 2023 Planning Commission Agenda PackageSchuylkill County · Jun 2023Was reported, via a search snippet only, to hold the 2023 sketch plan with about 9,235 sq ft of buildings.
- Quandel Concrete merges with Lebanon County companyYahoo Finance (Republican Herald) · Mar 12, 2026Gives the Cass Township plant address as 9 Schaeffer Hill Road and shows the plant operating after the merger, with no mention of a new plant.
- Quandel Concrete fire ruled accidentalYahoo News (Republican Herald) · Jan 9, 2023Reports the January 2023 fire at the Cass Township plant and the owners' plan to rebuild.
Planning terms explained
- Land development
- A formal plan to build or expand non-residential buildings or sites, which the township and county review.
- Sketch plan
- An early, informal drawing shown to planners for feedback before a formal application.
- County planning commission
- An advisory body that reviews local plans and comments, while the township usually decides.
- Stormwater permit
- A state permit that controls runoff from construction sites.
Researched by AI from public sources on Nov 19, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Cass Township supervisors and planning body would normally decide the plan at a public meeting. Residents can comment there, and the county planning commission's meeting page lists its agendas.
In Pennsylvania, Cass Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Cass Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Cass Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Cass Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Keystone Blvd subdivision, Cass Townshipsame area · subdivision (use not stated) · Cass Township · filed 2026-03-11
- Subdivision plan, Cass Townshipsame area · subdivision (use not stated) · Cass Township · filed 2026-02-11
- Storage building for construction vehicles, 16 Ash Rdsame area · 7,000 sq ft non-residential, warehouse & storage · Cass Township · filed 2026-10-02
- Final annexation plan, Cass Townshipsame area · lot line change · Cass Township · filed 2025-04-09
- Minor subdivision and annexation, Cass Townshipsame area · lot line change · Cass Township · filed 2024-11-20
- Highridge Park Service Plaza Lot 3 subdivisionsame area · recreation · Cass Township · filed 2024-08-12