[Schuylkill County](https://plannednearby.com/c/schuylkill-pa/) · [McAdoo Borough](https://plannednearby.com/c/schuylkill-pa/mcadoo-borough) · #2025-03-1-lot-church-minor-subdivision-mcadoo-bo

# 1-lot church minor subdivision, McAdoo Borough

McAdoo Borough, PA · institutional · 0.4 acres

In short: **1-lot church minor subdivision, McAdoo Borough** is an institutional project in McAdoo Borough, Schuylkill County, PA. The site is 0.4 acres. As of November 24, 2026, it is in review. Latest record: Final minor subdivision reviewed at a meeting of the county planning commission (March 12, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Final minor subdivision reviewed at a meeting of the county planning commission · Mar 12, 2025 · [source](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

A minor subdivision creating one lot of about 0.36 acres in McAdoo Borough for a church, shown on UPI 49-02-0230.000. The plan lists the church as its intended use, and the zoning is R-1 High Density Residential. The county reviewer said the plan appears to comply with the county subdivision ordinance.

**County recommendation:** Supports, with comments

- **Engineer / designer:** Shawn M. Donohue, PLS (surveyor of record)
- **Plan type:** Final minor subdivision
- **Land use:** institutional
- **Zoning:** R-1 High Density Residential (McAdoo Zoning)

## Project history

- **2025-03-12** · #2025-03-1-lot-church-minor-subdivision-mcadoo-bo · Final minor subdivision

[County plan review office →](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Map pin is approximate.

## The full picture AI research · Nov 12, 2026

A surveyor filed a plan to carve one lot of about 0.36 acres out of a larger parcel in McAdoo Borough. The plan names a church as the intended use. The lot is in an area zoned for dense housing (R-1 High Density Residential).

The county planning commission reviewed the final plan on March 12, 2025. The county reviewer said it appears to meet the county subdivision rules. A minor subdivision only divides land. It does not approve a building.

No web source was found that names the church, the owner, or any building plans for this lot. No news coverage, borough agenda or minutes, zoning decision, listing, or construction notice turned up. What is on the ground today could not be confirmed.

### What it could mean nearby

- The plan creates one lot and no new homes. Any effect on traffic, parking or noise would depend on the size of a future church building, which the records don't give.
- The lot sits in a dense residential zone, so neighbors would be the nearest users of any church that is built.

### Where it stands

The county planning commission reviewed the final minor subdivision on 2025-03-12, and the county reviewer found it appears to comply with the county subdivision ordinance. Borough sign-off, recording of the plan and any building or zoning permits for a church would usually come next. None of these were found online.

- **Mar 12, 2025** County planning commission reviewed the final minor subdivision plan

### Around the web

- [Planning Commission Meetings](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php) — Schuylkill County · Mar 12, 2025Index of county planning commission meetings, which includes the 2025-03-12 review; it names no church or owner.

Planning terms explained

- **Minor subdivision:** A simple split of land into a small number of lots, with no new streets or major utilities.
- **UPI:** The county's unique parcel identifier number for a piece of land.
- **R-1 High Density Residential:** A zoning district meant mainly for closely spaced homes.
- **County planning commission:** A county advisory board that checks subdivision plans against the county ordinance.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 12, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The borough's governing body and zoning officer handle local approvals and permits for the lot, and residents can raise concerns at McAdoo Borough public meetings. The county commission's review was advisory.

In Pennsylvania, McAdoo Borough decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the McAdoo Borough planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the McAdoo Borough manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find McAdoo Borough's meeting agendas →](https://www.google.com/search?q=McAdoo+Borough+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [McAdoo project final revised subdivision](https://plannednearby.com/x/schuylkill-2024-03-mcadoo-project-final-revised-subdivision) — same area · subdivision (use not stated) · Kline Township · filed 2024-03-13
- [Minor subdivision in McAdoo Borough](https://plannednearby.com/x/schuylkill-49-02-02300000) — same area · subdivision (use not stated) · McAdoo Borough · filed 2025-02-12
- [Commerce 81/McAdoo Lot 1 consolidation, Kline Township](https://plannednearby.com/x/schuylkill-2024-11-commerce-81-mcadoo-lot-1-consolidation-k) — same area · lot line change · Kline Township · filed 2024-11-13
- [Baldy Hollow & A&A Real Estate lot line adjustment](https://plannednearby.com/x/schuylkill-baldy-hollow-a-a-real-estate-lot-line-ad-4140bc) — same area · lot line change · Kline Township · filed 2025-04-28
- [Final minor/reverse subdivision, Kline Township](https://plannednearby.com/x/schuylkill-2025-05-final-minor-reverse-subdivision-kline-to) — same area · lot line change · Kline Township · filed 2025-05-14
- [Minor subdivision, Hazleton Beltway Center Ph 2](https://plannednearby.com/x/schuylkill-2026-03-minor-subdivision-hazleton-beltway-cente) — same area · subdivision (use not stated) · Kline Township · filed 2026-03-11

[See everything nearby on a map →](https://plannednearby.com/near#40.89703,-76.00243,McAdoo%20Borough)

---

Source page: https://plannednearby.com/x/schuylkill-2025-03-1-lot-church-minor-subdivision-mcadoo-bo

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
