Schuylkill County · West Penn Township · #2025-06-ridge-road-solar-land-development-west-p · Solar farms tracker
Ridge Road Solar land development, West Penn Twp
Ridge Road, West Penn Township, West Penn Township, PA · other
In short: Ridge Road Solar land development, West Penn Twp is a development project in West Penn Township, Schuylkill County, PA. As of November 24, 2026, it is approved according to web research. Latest record: A Times News report from August 2025 says the supervisors voted unanimously to conditionally approve the final plan for about 33,000 panels on 79 acres. What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.
Usually next: building and stormwater permits; site work often starts within 3 to 12 months.
About this project
Final land development plan for a solar project on Ridge Road in West Penn Township, reviewed by county staff and approved in the municipal plan review motion. The agenda gives no further details.
County recommendation: Supports
- Plan type
- Final land development plan
- Land use
- other
Project history
- 2025-06-11 · #2025-06-ridge-road-solar-land-development-west-p · Final land development plan
Map pin is approximate.
The full picture AI research · Nov 8, 2026
A solar farm is proposed on Ridge Road in West Penn Township, near Ash Circle. Local news describes about 33,000 solar panels on roughly 79 acres. The county's records describe the filing only as a final land development plan for a solar project.
The township supervisors gave the final plan conditional approval in August 2025. They had delayed the vote in July until the developer supplied a plan for removing the panels at the end of their life, plus agreements covering the land development and stormwater. In October 2025 the supervisors also approved a maintenance easement agreement with two companies, PAB Solar 31 LLC and PAB Solar 32 LLC. The articles do not say which company is the developer.
No reports of construction, a permit or an opening were found. The project's current on-the-ground status is unconfirmed.
What it could mean nearby
- Solar farms generate little traffic once built. Most truck traffic would come during construction, but no source describes a traffic study.
- The stormwater agreement and the panel-removal plan are the township's safeguards for runoff and for the site's long-term future.
- The site is about 79 acres near Ridge Road and Ash Circle, so it would change how that land looks and is used.
Where it stands
The township supervisors gave conditional approval to the final plan in August 2025. A follow-up easement agreement was approved in October 2025, and no later step was found. Permits and construction usually follow once the conditions are met, but no source confirms either.
- Oct 2025 Township supervisors approved a maintenance easement agreement with PAB Solar 31 LLC and PAB Solar 32 LLC on a 2-0 vote
- Aug 2025 Supervisors gave unanimous conditional approval to the final plan after the developer submitted the required documents
- Jul 2025 Supervisors tabled the final plan vote while waiting for a decommissioning plan and agreements
- Jun 11, 2025 Final land development plan filed for county review
Around the web
- Ridge Road Solar Land Development (West Penn Township)Times News (tnonline.com) · Oct 25, 2025The supervisors approved a maintenance easement agreement tied to the project, and the required agreements were submitted.
- West Penn Township supervisors conditionally approve Ridge Road solar final planTimes News (tnonline.com) · Aug 14, 2025The supervisors unanimously gave conditional final approval for about 33,000 panels on 79 acres.
Planning terms explained
- Final land development plan
- The detailed site plan a developer submits for formal approval before building.
- Conditional approval
- Approval that depends on the developer meeting listed requirements.
- Decommissioning plan
- A plan for removing the panels and equipment and restoring the land when the project ends.
- Maintenance easement agreement
- An agreement giving the township or others legal access or rights over part of the property for upkeep, such as stormwater facilities.
Researched by AI from public sources on Nov 8, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The West Penn Township supervisors decided the final plan at public meetings, so residents can raise concerns with the township about remaining conditions.
In Pennsylvania, West Penn Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the West Penn Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the West Penn Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find West Penn Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- 128 Ash Circle annexation, West Penn Townshipsame area · lot line change · West Penn Township · filed 2024-11-13
- Final land development, West Penn Townshipsame area · other · West Penn Township · filed 2024-07-15
- Lot annexation between two parcels, West Penn Twpsame area · lot line change · West Penn Township · filed 2025-10-21
- Storage land development, West Penn Townshipsame area · warehouse & storage · West Penn Township · filed 2026-03-11
- Annexation at 128 Ash Circle, West Penn Townshipsame area · lot line change · West Penn Township · filed 2024-12-11
- Lot consolidation on Golf Road, West Penn Twpsame area · lot line change · West Penn Township · filed 2025-07-09