PlannedNearby

Schuylkill County · Washington Township · #2025-09-final-minor-subdivision-washington-towns

Final minor subdivision, Washington Township

UPI 33-03-0002.000, Washington Township, Washington Township, PA · subdivision (use not stated)

In short: Final minor subdivision, Washington Township is a subdivision at Upi 33-03-0002.000 in Washington Township, Schuylkill County, PA. As of November 24, 2026, it is approved according to web research. Latest record: The county record says the Planning Commission granted conditional final plan approval until December 10, 2025. What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved The county record says the Planning Commission granted conditional final plan approval until December 10, 2025. No web source was found to show anything further. · web research checked Nov 7, 2026 AI research
  1. Proposed
  2. In reviewSep 2025
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

A final minor subdivision plan in Washington Township covering one existing parcel. The Planning Commission granted conditional final plan approval until December 10, 2025. The agenda does not describe what is built or its size.

Issues raised: Written correspondence from the Schuylkill Conservation District or PA DEP showing Chapter 102 requirements are met must be submitted before final approval (Section 504.J.3)

Plan type
Final minor subdivision
Land use
other

Project history

  • 2025-09-10 · #2025-09-final-minor-subdivision-washington-towns · Final minor subdivision

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 7, 2026

A landowner in Washington Township, Schuylkill County, has asked the county to approve a small subdivision. It would divide one existing parcel (tax ID 33-03-0002.000) into smaller pieces. A "minor" subdivision is the simplest kind of land split. It usually involves only a few lots and no new streets.

The county Planning Commission gave conditional final approval, good until December 10, 2025. The records do not say what, if anything, will be built, how many lots result, or who the owner or developer is.

No developer page, news story, township agenda, listing, business listing or permit record was found for this site. Nothing online shows whether the land has been split, sold or built on. The county records are the only source for this project.

What it could mean nearby

Where it stands

The county Planning Commission granted conditional final approval, which was good until December 10, 2025. The filing was in county review as of 2025-09-10. Normally the owner must meet the listed conditions before the plan is signed and recorded. No source shows whether that happened.

Planning terms explained
Minor subdivision
A simple division of land into a small number of lots, usually with no new streets or public utilities.
Final plan approval
The last review step. The plan can then be signed and recorded, and the lots legally created.
Conditional approval
Approval that depends on the owner fixing listed items by a deadline.
UPI
Unique parcel identifier, the county's tax-parcel ID number for a piece of land.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Schuylkill County Planning Commission reviews the plan, and the Washington Township supervisors handle local approvals. Residents can contact either body or attend their public meetings.

In Pennsylvania, Washington Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Washington Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →