[Schuylkill County](https://plannednearby.com/c/schuylkill-pa/) · [Upper Mahantongo Township](https://plannednearby.com/c/schuylkill-pa/upper-mahantongo-township) · #31-03-0025000

# Annexation/consolidation plan, Upper Mahantongo Twp

Upper Mahantongo Township, PA · lot line change

In short: **Annexation/consolidation plan, Upper Mahantongo Twp** is a lot line change in Upper Mahantongo Township, Schuylkill County, PA. As of November 24, 2026, it is approved. Latest record: Annexation/consolidation plan (conditional final approval) approved (May 14, 2025). What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Stage: Approved · Annexation/consolidation plan (conditional final approval) approved · May 14, 2025 · [source](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

## About this project

An annexation/consolidation plan for land in Upper Mahantongo Township, granted conditional final approval until August 13, 2025. A deed of annexation must be reviewed and approved before final plan approval.

Issues raised: Deed of annexation must be submitted and reviewed before final approval, Deeds must include language required by Section 404.D

- **Applicant:** Stephen W. & Virginia L. Haas; Salem United Church of Christ
- **Plan type:** Annexation/consolidation plan (conditional final approval)
- **Land use:** lot-line-change

## Project history

- **2025-05-14** · #31-03-0025000 · Annexation/consolidation plan (conditional final approval)

[County plan review office →](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Map pin is approximate.

## The full picture AI research · Nov 8, 2026

This is a lot line change, not a building project. Two private landowners and Salem United Church of Christ plan to move land between their neighboring properties in Upper Mahantongo Township. The plan is called an annexation/consolidation plan. A strip or parcel of land is detached from one owner and joined to another owner's lot.

The county gave the plan conditional final approval on May 14, 2025. The condition was that a deed of annexation be reviewed and approved before the plan is finally signed off, and the approval ran until August 13, 2025.

No new homes, buildings or businesses are described in the records. No news coverage, developer page, listing or construction notice was found for this plan. The church appears to be the Salem church in the Rough & Ready area, and county tax records show church-owned parcels on Church Road.

### What it could mean nearby

- The records describe only a change in property boundaries, so no added traffic, homes or jobs are indicated.
- No new buildings or road changes appear in the records, so neighbors are unlikely to see physical change from this step alone.

### Where it stands

The county gave conditional final approval on 2025-05-14, subject to review and approval of a deed of annexation. Normally the deed is then recorded and the plan is signed off, but no source found shows whether that happened.

- **Aug 13, 2025** Deadline for meeting the conditions of the conditional final approval
- **May 14, 2025** County granted conditional final approval of the annexation/consolidation plan

### Who's behind it

Salem United Church of Christ · A congregation that appears to be the Salem church near Rough & Ready in Upper Mahantongo Township; it is a landowner in this plan, not a builder.

### Around the web

- [The Salem Church of Rough & Ready](https://www.lykensvalley.org/the-salem-church-of-rough-ready/) — Lykens Valley: History & GenealogyPlaces the Salem church congregation in Upper Mahantongo Township.
- [11 Church Road](https://gis.vgsi.com/SchuylkillCountyPA/Parcel.aspx?pid=37307) — Schuylkill County assessment recordsShows a church-owned parcel on Church Road in the township, with no mention of the annexation.

Planning terms explained

- **Annexation/consolidation plan:** A plan that moves land from one parcel to another and merges it into the receiving lot, with no new lots for development.
- **Lot line change:** An adjustment to the boundary between neighboring properties.
- **Conditional final approval:** Approval that becomes final only after listed conditions are met, here the deed review.
- **Deed of annexation:** The legal deed that transfers the annexed land to the neighboring owner.

Researched by AI from public sources on Nov 8, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The township and the Schuylkill County planning bodies handle subdivision and annexation plans, but this plan already has conditional approval, so comments would go to the township office.

In Pennsylvania, Upper Mahantongo Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Upper Mahantongo Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Upper Mahantongo Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Upper Mahantongo Township's meeting agendas →](https://www.google.com/search?q=Upper+Mahantongo+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Final lot annexation, Upper Mahantongo Twp](https://plannednearby.com/x/schuylkill-final-lot-annexation-upper-mahantongo-tw-8f317d) — same area · lot line change · Upper Mahantongo Township · filed 2026-11-04
- [Final subdivision, Upper Mahantongo Township](https://plannednearby.com/x/schuylkill-31-04-0099000) — same area · subdivision (use not stated) · Upper Mahantongo Township · filed 2024-06-12
- [Final annexation plan, Upper Mahantongo Township](https://plannednearby.com/x/schuylkill-55) — same area · lot line change · Upper Mahantongo Township · filed 2024-09-11
- [Annexation plan, Upper Mahantongo Township](https://plannednearby.com/x/schuylkill-31-07-0009000) — same area · lot line change · Upper Mahantongo Township · filed 2024-08-14
- [Manufacturing land development, Upper Mahantongo Twp](https://plannednearby.com/x/schuylkill-31-04-0092003) — same area · industrial · Upper Mahantongo Township · filed 2025-05-14
- [Annexation/consolidation plan in Upper Mahantongo Twp](https://plannednearby.com/x/schuylkill-annexation-consolidation-plan-in-upper-m-081309) — same area · lot line change · Upper Mahantongo Township · filed 2025-09-10

[See everything nearby on a map →](https://plannednearby.com/near#40.66919,-76.63736,Upper%20Mahantongo%20Township)

---

Source page: https://plannednearby.com/x/schuylkill-31-03-0025000

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
