# Manufacturing land development, Upper Mahantongo Twp

Upper Mahantongo Township, PA · industrial

In short: **Manufacturing land development, Upper Mahantongo Twp** is an industrial development in Upper Mahantongo Township, Schuylkill County, PA. As of November 24, 2026, it is approved. Latest record: Preliminary/final land development (conditional final approval) approved (May 14, 2025). What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Stage: Approved · Preliminary/final land development (conditional final approval) approved · May 14, 2025 · [source](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

## About this project

A preliminary/final land development plan for Big B Manufacturing in Upper Mahantongo Township, granted conditional final approval until August 13, 2025. Conditions include erosion control approval, sewage permit documentation, easements, a cost estimate, and financial security.

Issues raised: Erosion and sediment control plan must be approved by Schuylkill Conservation District, Sewage permit documentation from the Township required, Easement information for facilities on Parcel 001 required, Development statement, schedule, and detailed cost estimate required, Financial security and development agreements under Article 9 required

- **Plan type:** Preliminary/final land development (conditional final approval)
- **Land use:** industrial

## Project history

- **2025-05-14** · #31-04-0092003 · Preliminary/final land development (conditional final approval)

[County plan review office →](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Map pin is approximate.

## The full picture AI research · Nov 12, 2026

Big B Manufacturing, a metal machining and fabrication company based in the Klingerstown area, has a land development plan in Upper Mahantongo Township, Schuylkill County. The county lists it as an industrial project. Land development here means new building or site work on a lot. The county summary doesn't give the building size, the exact site or the acreage.

The county planning commission gave the plan conditional final approval on May 14, 2025. The developer had until August 13, 2025 to meet the conditions. These were erosion control approval, sewage permit paperwork, easements, a cost estimate and financial security (a guarantee that the site work gets finished).

No news stories, township minutes, company announcements, listings or state permit records about this project were found online. Whether the conditions were met, or whether work has begun, is unconfirmed.

### What it could mean nearby

- Possible truck and employee traffic on local roads, but the records don't give traffic details.
- The sewage permit condition means the site will probably use an on-site or approved sewage system. The records don't say which.
- Erosion control approval is required, which bears on runoff and nearby streams during construction.
- The records don't state any job numbers.

### Where it stands

The plan has conditional final approval as of May 14, 2025, with a deadline of August 13, 2025 to meet the conditions. No later record was found showing the conditions were satisfied, so the next steps would be recording the plan, getting permits and starting construction.

- **Aug 13, 2025** Deadline to meet the conditions of the conditional final approval
- **May 14, 2025** Preliminary/final land development plan given conditional final approval

### Who's behind it

Big B Manufacturing · Business directories describe it as a machining, fabrication and welding company in the Klingerstown area. No official company website was found.

### Around the web

- [Planning Commission Meetings](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php) — Schuylkill County · May 14, 2025Official county page for the planning commission meetings, which is where the May 2025 conditional approval comes from.

Planning terms explained

- **Preliminary/final land development plan:** A single plan that combines the early and last review stages for new construction on a site.
- **Conditional final approval:** Approval that takes effect only if the developer meets a list of conditions by a set date.
- **Erosion control approval:** Sign-off on how the site will keep soil from washing away during construction.
- **Financial security:** Money or a bond held to guarantee that the required site improvements get finished.
- **Easement:** A legal right for someone to use part of a property, for example for utilities or access.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 12, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The approval has already been granted. Residents can ask the Upper Mahantongo Township supervisors or the Schuylkill County Planning & Zoning office about any remaining steps.

In Pennsylvania, Upper Mahantongo Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Upper Mahantongo Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Upper Mahantongo Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Upper Mahantongo Township's meeting agendas →](https://www.google.com/search?q=Upper+Mahantongo+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Final annexation plan, Upper Mahantongo Township](https://plannednearby.com/x/schuylkill-55) — same area · lot line change · Upper Mahantongo Township · filed 2024-09-11
- [Final subdivision, Upper Mahantongo Township](https://plannednearby.com/x/schuylkill-31-04-0099000) — same area · subdivision (use not stated) · Upper Mahantongo Township · filed 2024-06-12
- [Annexation/consolidation plan, Upper Mahantongo Twp](https://plannednearby.com/x/schuylkill-31-03-0025000) — same area · lot line change · Upper Mahantongo Township · filed 2025-05-14
- [Final lot annexation, Upper Mahantongo Twp](https://plannednearby.com/x/schuylkill-final-lot-annexation-upper-mahantongo-tw-8f317d) — same area · lot line change · Upper Mahantongo Township · filed 2026-11-04
- [Final subdivision, Upper Mahantongo Township](https://plannednearby.com/x/schuylkill-2024-07-final-subdivision-upper-mahantongo-towns) — same area · subdivision (use not stated) · Upper Mahantongo Township · filed 2024-07-10
- [Annexation plan, Upper Mahantongo Township](https://plannednearby.com/x/schuylkill-31-07-0009000) — same area · lot line change · Upper Mahantongo Township · filed 2024-08-14

[See everything nearby on a map →](https://plannednearby.com/near#40.66934,-76.62933,Upper%20Mahantongo%20Township)

---

Source page: https://plannednearby.com/x/schuylkill-31-04-0092003

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.