Schuylkill County · Upper Mahantongo Township · #31-04-0099000

Final subdivision, Upper Mahantongo Township

Upper Mahantongo Township, PA · subdivision (use not stated)

In short: Final subdivision, Upper Mahantongo Township is a subdivision in Upper Mahantongo Township, Schuylkill County, PA. As of November 24, 2026, it is approved. Latest record: Final subdivision (conditional final approval) approved (June 12, 2024). What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved Final subdivision (conditional final approval) approved · Jun 12, 2024 · source
  1. Proposed
  2. In review
  3. ApprovedJun 2024
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

A final subdivision of parcel 31-04-0099.000 in Upper Mahantongo Township. Final approval requires written PA DEP correspondence on sewage planning and confirmation that Chapter 102 erosion requirements are met.

County recommendation: Supports, with comments

Issues raised: Sewage planning module needs PA DEP written correspondence (504.F), Chapter 102 compliance letter required before final approval (504.J.3)

Plan type
Final subdivision (conditional final approval)
Land use
other

Project history

  • 2024-06-12 · #31-04-0099000 · Final subdivision (conditional final approval)

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 16, 2026

County records show a final subdivision of one parcel (31-04-0099.000) in Upper Mahantongo Township, Schuylkill County. A subdivision splits a property into separate lots. The records don't say what will be built, how many lots there are, or who owns the land.

The Schuylkill County Planning Commission gave conditional final approval on 2024-06-12. Two conditions apply. The applicant must provide written correspondence from the PA Department of Environmental Protection (DEP) on sewage planning. It must also confirm that state erosion and sediment control rules (Chapter 102) are met.

No developer page, news story, listing, business listing, township agenda or minutes, or permit record could be tied to this parcel. Nothing found shows construction, sales or an opening.

What it could mean nearby

Where it stands

The project has conditional final approval from the county planning commission (2024-06-12). The applicant must still satisfy the DEP sewage and erosion-control conditions. After that, the plan is normally signed and recorded, and any building or site permits would come later. No source found shows whether those steps have happened.

Around the web

Planning terms explained
Final subdivision
The last plan stage for dividing a property into lots, with exact boundaries and conditions.
Conditional final approval
Approval that takes full effect only after the applicant meets listed conditions.
Sewage planning
State review of how new lots will handle wastewater, through public sewer or on-site systems.
Chapter 102
Pennsylvania's rules for controlling erosion and sediment from earth-moving work.
PA DEP
The Pennsylvania Department of Environmental Protection, which oversees sewage and stormwater rules.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 16, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The conditional approval is already granted. Residents can ask the Schuylkill County Planning & Zoning office or the Upper Mahantongo Township office about the plan and any later permits.

In Pennsylvania, Upper Mahantongo Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Upper Mahantongo Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.