Schuylkill County · Frackville Borough · #43-01-005400043-01-0057000
JMAC Realty 2-lot subdivision, Frackville
Frackville Borough, PA · lot line change
In short: JMAC Realty 2-lot subdivision, Frackville is a lot line change in Frackville Borough, Schuylkill County, PA. As of November 24, 2026, it is approved according to web research. Latest record: The county planning commission record for 2025-04-09 shows conditional final approval of the two-lot subdivision, and no later source was found. What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.
Usually next: building and stormwater permits; site work often starts within 3 to 12 months.
About this project
A two-lot subdivision of JMAC Realty, LLC land in Frackville Borough, identified by parcels 43-01-0054.000 and 43-01-0057.000. The county granted conditional final approval, and the agenda does not describe lot sizes or current use.
County recommendation: Supports, with comments
Issues raised: Deed of annexation must be submitted and approved before final approval (Sec. 404.D), Deed must contain specific language required by Sec. 404.D
- Applicant
- JMAC Realty, LLC
- Plan type
- Conditional final subdivision (Lots #1 and #2)
- Land use
- lot-line-change
Project history
- 2025-04-09 · #43-01-005400043-01-0057000 · Conditional final subdivision (Lots #1 and #2)
Map pin is approximate.
The full picture AI research · Nov 12, 2026
The county planning commission reviewed a two-lot subdivision of land owned by JMAC Realty, LLC in Frackville Borough, Schuylkill County. The land is two parcels, 43-01-0054.000 and 43-01-0057.000. In April 2025 the commission gave it conditional final approval. The county lists the type as a lot line change, which means property boundaries are redrawn between existing parcels. That usually does not create new building lots.
The county agenda does not give lot sizes, a street address or the current use of the land. The conditions attached to the approval were not found either. The agenda and minutes PDFs could not be read in full.
No developer page, news story, borough minutes, sale listing, business listing or construction notice was found for this project. Nothing online shows that any building has started or finished.
What it could mean nearby
- The records do not describe any new homes, businesses or buildings, so no effect on traffic, schools or utilities can be stated.
- A lot line change by itself normally does not add buildings. Any later construction would need its own permits.
Where it stands
The county planning commission gave conditional final approval on 2025-04-09. The next steps are usually meeting the conditions and recording the plan. Any construction would then need borough permits. No source found shows these steps were completed.
- Apr 9, 2025 County planning commission reviewed the two-lot subdivision and granted conditional final approval
Who's behind it
JMAC Realty, LLC · A third-party investor profile describes it as a buy-and-hold real estate investor in the Pottsville area. County assessment records show it owns several properties in Schuylkill County.
Around the web
- Planning Commission MeetingsSchuylkill County · Apr 9, 2025Lists the April 9, 2025 planning commission meeting and its agenda and minutes documents.
- JMAC REALTY LLCSFR AnalyticsThird-party profile describing JMAC Realty as a buy-and-hold investor active in the Pottsville area.
- 120 E Chestnut StSchuylkill County assessment · Apr 28, 2025Shows JMAC Realty owns a different small Frackville parcel, bought in April 2025. It is not one of the two parcels in this subdivision.
Planning terms explained
- Lot line change
- A change to the shared boundary between existing parcels that does not normally create new building lots.
- Conditional final approval
- The plan is approved as long as the applicant meets listed conditions, usually before the plan can be recorded.
- Subdivision
- The division or reshaping of land into separate lots.
- Parcel number
- The county's ID for a tax parcel, used to identify the land in records.
Researched by AI from public sources on Nov 12, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The county planning commission has already acted. Residents can raise concerns with the Frackville Borough office about any later permits, and the borough's meeting schedule is not confirmed here.
In Pennsylvania, Frackville Borough decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Frackville Borough planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Frackville Borough manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Frackville Borough's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Lot annexation in Frackville Boroughsame area · lot line change · Frackville Borough · filed 2026-01-14
- Final minor subdivision, Frackville Boroughsame area · subdivision (use not stated) · Frackville Borough · filed 2025-09-10
- Lot annexation plan, Frackville Boroughsame area · lot line change · Frackville Borough · filed 2024-08-14
- Final lot annexation plan, Frackville Boroughsame area · lot line change · Frackville Borough · filed 2024-09-11
- Church lot consolidation, Gilberton Boroughsame area · lot line change · Gilberton Borough · filed 2026-03-11
- Annexation final plan, Frackville Boroughsame area · lot line change · Frackville Borough · filed 2025-12-18