2.4 MW solar farm on Mill Road, Barry Township

West side of Mill Road (T-403), Barry Township, PA · agricultural · 9.3 acres

In short: 2.4 MW solar farm on Mill Road, Barry Township is an agricultural project in Barry Township, Schuylkill County, PA. The site is 9.3 acres. As of November 24, 2026, the public records we track show nothing newer since June 12, 2024. The town may have acted since.

No recent records Latest record we have · Jun 12, 2024
  1. Proposed
  2. In reviewJun 2024
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

About this project

Plans a 2.4 MW solar farm on about 9.35 acres on the west side of Mill Road in Barry Township, in the agricultural district. The county engineer's review of this preliminary plan lists several fixes. The commission must still decide on landscaping and waiver requests.

County recommendation: Supports, with comments

Issues raised: Right-of-way width (33 ft vs. 50 ft) and bearings/distances conflict; closure calculation requested, Chapter 102 and NPDES approvals required before final approval, Waiver requested from stormwater berm freeboard requirements, Waiver requested from 50-ft stormwater setback to property and right-of-way lines, Buffer screen on the east side may be needed for nearby homes

Engineer / designer
ARM Group, LLC
Plan type
Preliminary land development
Land use
other
Zoning
Agricultural

Project history

  • 2024-06-12 · #44 · Preliminary land development

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 16, 2026

A 2.4-megawatt solar farm is planned on about 9.35 acres on the west side of Mill Road (T-403) in Barry Township, Schuylkill County. The land is in the township's agricultural district. A solar farm of this kind is a field of ground-mounted panels that feeds electricity into the grid. ARM Group, LLC is listed on the county filing.

The county planning commission reviewed the preliminary land development plan on 2024-06-12. The county engineer's review listed several fixes. The commission still had to decide on landscaping and waiver requests, which are requests to be excused from certain plan rules.

No news coverage, township minutes, developer project page, state permit record or sign of construction was found for this site. The county records are the only source on this project.

What it could mean nearby

Where it stands

The latest record, from 2024-06-12, shows a preliminary plan under county review with fixes and landscaping and waiver decisions still open. No later record was found. Final plan approval and then township and state stormwater approvals would usually follow.

Who's behind it

ARM Group, LLC · ARM Group, LLC is named on the county filing. It is not confirmed whether the firm is the developer or the engineering consultant.

Around the web

Planning terms explained
Preliminary land development plan
An early formal plan showing the layout of a project, which reviewers comment on before the final plan.
Waiver
A request to be excused from a specific rule in the township's development ordinance.
Agricultural district
A zoning area meant mainly for farming and related uses.
Megawatt (MW)
A unit of power. 2.4 MW is enough to supply several hundred homes.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 16, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Barry Township supervisors decide on the land development plan after the county review, and residents can comment at their public meetings. Contact the township office for dates.

In Pennsylvania, Barry Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Barry Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.