# Baldy Hollow & A&A Real Estate lot line adjustment

South of the terminus of Plant Road, Kline Township, PA · lot line change

In short: **Baldy Hollow & A&A Real Estate lot line adjustment** is a lot line change in Kline Township, Schuylkill County, PA. As of November 24, 2026, it is in review. Latest record: Final minor/reverse subdivision reviewed at a meeting of the county planning commission (April 28, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Final minor/reverse subdivision reviewed at a meeting of the county planning commission · Apr 28, 2025 · [source](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

A lot line adjustment between two industrial parcels south of the end of Plant Road in Kline Township. It fixes an existing encroachment and creates no new lots. Both parcels stay industrial, with water and sewer already on site.

**County recommendation:** No position

Issues raised: UPI number must be shown on the plan and certified by the County Assessment Office, Requested waivers need stated grounds, hardship, and minimum modifications

- **Applicant:** A&A Real Estate Associates LP; Baldy Hollow Sportsmen Club, Inc.
- **Plan type:** Final minor/reverse subdivision
- **Land use:** lot-line-change
- **Zoning:** I-1 (Light Industrial District)

## Project history

- **2025-04-28** · #2025-06-baldy-hollow-a-a-real-estate-lot-line-ad · Final minor/reverse subdivision

[County plan review office →](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Map pin is approximate.

## The full picture AI research · Nov 21, 2026

This is a boundary change between two neighboring industrial properties south of where Plant Road ends in Kline Township. One parcel belongs to A&A Real Estate Associates LP and the other to Baldy Hollow Sportsmen Club, Inc. The county summary says the change fixes an existing encroachment, where something on one parcel crosses the property line.

No new lots and no new homes are created. Both parcels stay industrial, and water and sewer service are already on site. Nothing is proposed to be built.

No developer page, news story, township agenda or minutes, listing, or permit was found for this adjustment. The county filing is dated April 28, 2025. The county's own list of 2025 planning commission meetings has no April 28 meeting. Its meetings were April 9 and May 14, so April 28 is probably a filing or review-letter date.

### What it could mean nearby

- No new homes, lots or buildings are proposed, so no added traffic, school or utility demand is expected from this plan.
- Water and sewer are already on site, and the county summary does not describe any new service.
- The change mainly settles a property-line problem between two neighbors.

### Where it stands

County records show the plan as a final minor (reverse) subdivision under review, with the latest filing dated 2025-04-28. No decision, recording or later activity was found. Such plans are usually approved or conditionally approved by the county planning commission, and the revised line is then recorded with the county. Note: The page says the plan was reviewed at a county planning commission meeting on April 28, 2025, but the county's meeting list shows no meeting that day (2025 meetings included April 9 and May 14), so April 28 is likely a submission or letter date.

- **May 14, 2025** County planning commission meeting where the plan may have been on the agenda (not confirmed)
- **Apr 28, 2025** Latest county filing date for the lot line adjustment (not a meeting date)

### Who's behind it

A&A Real Estate Associates LP · A limited partnership that, per county assessment records, owns industrial and other property in the McAdoo and Kline Township area. The co-applicant is Baldy Hollow Sportsmen Club, Inc.

### Around the web

- [Planning Commission Meetings](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php) — Schuylkill County, PALists 2025 meeting dates (including 4/9 and 5/14) with no April 28 meeting, and does not mention this project.

Planning terms explained

- **Lot line adjustment:** A change to the shared boundary between neighboring parcels that moves land from one to the other without creating a new lot.
- **Reverse subdivision:** A process that combines or reshapes existing lots instead of dividing them into more lots.
- **Encroachment:** A building, road or other feature that sits partly on a neighbor's land.
- **Final minor subdivision:** A simplified final-approval review for small land changes that add few or no lots.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 21, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Schuylkill County Planning Commission reviews the plan at its monthly public meetings, and residents can contact the county planning office or the Kline Township supervisors.

In Pennsylvania, Kline Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Kline Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Kline Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Kline Township's meeting agendas →](https://www.google.com/search?q=Kline+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Commerce 81/McAdoo Lot 1 consolidation, Kline Township](https://plannednearby.com/x/schuylkill-2024-11-commerce-81-mcadoo-lot-1-consolidation-k) — same area · lot line change · Kline Township · filed 2024-11-13
- [Minor subdivision, Hazleton Beltway Center Ph 2](https://plannednearby.com/x/schuylkill-2026-03-minor-subdivision-hazleton-beltway-cente) — same area · subdivision (use not stated) · Kline Township · filed 2026-03-11
- [Butler Enterprises Summit Lands Subdivision III](https://plannednearby.com/x/schuylkill-butler-enterprises-summit-lands-subdivis-aeb99e) — same area · subdivision (use not stated) · Kline Township · filed 2024-11-13
- [Project Brewster data center campus](https://plannednearby.com/x/schuylkill-2026-06-project-brewster-data-center-campus) — same area · data center · Kline Township · filed 2026-06-10
- [Final minor/reverse subdivision, Kline Township](https://plannednearby.com/x/schuylkill-2025-05-final-minor-reverse-subdivision-kline-to) — same area · lot line change · Kline Township · filed 2025-05-14
- [McAdoo project final revised subdivision](https://plannednearby.com/x/schuylkill-2024-03-mcadoo-project-final-revised-subdivision) — same area · subdivision (use not stated) · Kline Township · filed 2024-03-13

[See everything nearby on a map →](https://plannednearby.com/near#40.87836,-76.00138,Kline%20Township)

---

Source page: https://plannednearby.com/x/schuylkill-baldy-hollow-a-a-real-estate-lot-line-ad-4140bc

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.