# Big B Manufacturing building expansion, Upper Mahantongo

Upper Mahantongo Township, PA · industrial · 10.4 acres

In short: **Big B Manufacturing building expansion, Upper Mahantongo** is an industrial development in Upper Mahantongo Township, Schuylkill County, PA. The site is 10.4 acres. As of November 24, 2026, it is in review. Latest record: Preliminary/final land development reviewed at a meeting of the county planning commission (June 11, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Preliminary/final land development reviewed at a meeting of the county planning commission · Jun 11, 2025 · [source](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

An expansion of the existing Big B Manufacturing building on a 10.39-acre parcel in Upper Mahantongo Township. The project adds building space, paving, utilities, landscaping and stormwater controls. Staff recommends conditional final plan approval.

**County recommendation:** Supports, with comments

Issues raised: Parcel 001 improvements need a boundary on the plan or easements, Erosion and sediment control plan needs Conservation District approval, Sewage permit copy and easement documents are needed for final plan, Adequacy of the roadside swale receiving UGB 1 must be shown, Development cost estimate and financial security are required

- **Applicant:** Big B Manufacturing
- **Engineer / designer:** Bohler
- **Plan type:** Preliminary/final land development
- **Land use:** industrial
- **Zoning:** A - Agricultural

## Project history

- **2025-06-11** · #2025-06-big-b-manufacturing-building-expansion-u · Preliminary/final land development

[County plan review office →](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Map pin is approximate.

## The full picture AI research · Nov 8, 2026

Big B Manufacturing plans to enlarge its existing building on a 10.39-acre parcel in Upper Mahantongo Township, Schuylkill County. County records say the work adds building space, paving, utilities, landscaping and stormwater controls. Stormwater controls are features that manage rain runoff from the larger roof and paved areas.

The county planning staff recommends conditional final approval. That means the plan would be approved as long as the developer meets a list of remaining requirements. The project is industrial, and no new homes are involved.

No news coverage, township meeting records, builder project page, listing or permit record specific to this expansion was found online. The records do not show whether construction has started. The size of the new addition is not given in the records found.

### What it could mean nearby

- The county records list added paving and stormwater controls, which are meant to handle the runoff from the larger building and parking areas.
- The project expands an existing manufacturing site rather than creating a new one, so the type of use at the site stays the same.
- The records do not give job numbers or traffic figures, so effects on traffic and employment are not known.

### Where it stands

County records show the land development plan was filed for county review on 2025-06-11, and county staff recommended conditional final approval. After conditional approval, the developer usually has to meet the listed conditions, receive township sign-off and obtain building and stormwater permits before construction starts.

- **Jun 11, 2025** Preliminary/final land development plan filed for county review; staff recommends conditional final approval

### Who's behind it

Big B Manufacturing · Big B Manufacturing is the owner of the existing building, and the county filing also names Bohler, which is commonly an engineering and site-design firm.

Planning terms explained

- **Land development:** A formal plan for building or enlarging a structure and the site work around it, which the municipality and county review.
- **Preliminary/final plan:** A single combined review step in which the plan is checked in full and can be approved for construction.
- **Conditional approval:** Approval that depends on the developer meeting a list of listed requirements.
- **Stormwater controls:** Basins, pipes or other features that hold or slow rain runoff so it does not flood neighboring land.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 8, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Schuylkill County planning commission reviews the plan, and the Upper Mahantongo Township supervisors usually make the local decision. Residents can comment at public meetings or by contacting the township office.

In Pennsylvania, Upper Mahantongo Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Upper Mahantongo Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Upper Mahantongo Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Upper Mahantongo Township's meeting agendas →](https://www.google.com/search?q=Upper+Mahantongo+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Annexation/consolidation plan in Upper Mahantongo Twp](https://plannednearby.com/x/schuylkill-annexation-consolidation-plan-in-upper-m-081309) — same area · lot line change · Upper Mahantongo Township · filed 2025-09-10
- [Land development plans for Big B Manufacturing](https://plannednearby.com/x/schuylkill-land-development-plans-for-big-b-manufac-030253) — same area · industrial · Upper Mahantongo Township · filed 2025-09-10
- [Annexation/consolidation plan, cemetery, Upper Mahantongo](https://plannednearby.com/x/schuylkill-annexation-consolidation-plan-cemetery-u-17bede) — same area · lot line change · Upper Mahantongo Township · filed 2025-06-11
- [Final lot annexation, Upper Mahantongo Twp](https://plannednearby.com/x/schuylkill-final-lot-annexation-upper-mahantongo-tw-8f317d) — same area · lot line change · Upper Mahantongo Township · filed 2026-11-04
- [Annexation/consolidation plan, Upper Mahantongo Twp](https://plannednearby.com/x/schuylkill-31-03-0025000) — same area · lot line change · Upper Mahantongo Township · filed 2025-05-14
- [Annexation plan, Upper Mahantongo Township](https://plannednearby.com/x/schuylkill-31-07-0009000) — same area · lot line change · Upper Mahantongo Township · filed 2024-08-14

[See everything nearby on a map →](https://plannednearby.com/near#40.67356,-76.64711,Upper%20Mahantongo%20Township)

---

Source page: https://plannednearby.com/x/schuylkill-big-b-manufacturing-building-expansion-u-030253

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.