PlannedNearby

Schuylkill County · North Manheim Township · #2024-11-boundary-adjustment-on-deer-trail-dr-n-m

Boundary adjustment on Deer Trail Dr, N Manheim

319 Deer Trail Drive and 163 East Second Mountain Road, North Manheim Township, PA · lot line change

In short: Boundary adjustment on Deer Trail Dr, N Manheim is a lot line change in North Manheim Township, Schuylkill County, PA. As of November 24, 2026, the public records we track show nothing newer since September 24, 2024. The town may have acted since.

No recent records Latest record we have · Sep 24, 2024
  1. Proposed
  2. In reviewSep 2024
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

About this project

Adjusts the line between two R-A residential lots to remove a house that sits over the property line. No new lots are created, and both lots stay residential.

County recommendation: No position

Issues raised: The Recorder of Deeds needs two stamped copies, and any extra copies need a review stamp, UPI number must be shown and certified by the county assessment office before recording

Engineer / designer
Colonial Surveying
Plan type
Boundary adjustment and final annexation plan
Land use
lot-line-change
Zoning
R-A Residential Agricultural

Project history

  • 2024-09-24 · #2024-11-boundary-adjustment-on-deer-trail-dr-n-m · Boundary adjustment and final annexation plan

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 15, 2026

This is a boundary adjustment, not a construction project. Two neighboring residential lots, 319 Deer Trail Drive and 163 East Second Mountain Road in North Manheim Township, have a house that sits across the line between them. The plan moves the line so the house sits on only one lot.

No new lots and no new homes are created, and both lots stay residential. The county planning commission reviewed the plan in September 2024. A property-records page shows 319 Deer Trail Drive, a 1985 house on about 8 acres, as sold in December 2024. That sale is ordinary housing activity. It doesn't show that the line change was recorded.

No news coverage, developer page, township agenda or construction permit was found for this site.

What it could mean nearby

Where it stands

The county planning commission reviewed the plan on 2024-09-24, and nothing later was found. The usual next steps are township sign-off and recording of the revised lot lines. No later records on these steps were found.

Who's behind it

Colonial Surveying · The surveying firm named on the county filing. No company page was found.

Around the web

Planning terms explained
Lot line change
Moving the shared boundary between two neighboring lots without creating any new lots.
Annexation
Moving part of one lot into the neighboring lot, so the second lot grows and the first shrinks.
R-A zoning
A residential zoning district in the township.
Planning commission
A public board that reviews development plans and advises the local government.

Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: North Manheim Township's supervisors and the county planning commission handle this kind of plan; residents can comment at their public meetings or by contacting the township office.

In Pennsylvania, North Manheim Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find North Manheim Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →