Schuylkill County · West Brunswick Township · #2025-12-hickory-drive-storage-units-west-brunswi
Hickory Drive storage units, West Brunswick
60 Hickory Drive, West Brunswick Township, PA · 32,400 sq ft non-residential, warehouse & storage
In short: Hickory Drive storage units, West Brunswick is a warehouse and storage development at 60 Hickory Drive in West Brunswick Township, Schuylkill County, PA. It would add 32,400 sq ft of non-residential space. Its estimated construction value is about $4.2M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Preliminary/final land development plan reviewed at a meeting of the county planning commission (October 20, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
Seven storage unit buildings totaling 32,400 sq ft, plus paving and stormwater facilities, on a vacant industrial-zoned lot at 60 Hickory Drive. Public water is available and the site uses on-lot sewer.
County recommendation: Supports, with comments
Issues raised: Waiver requests must state hardship and be approved or removed from the plan, Driveway from Hickory Drive (T 714) needs municipal permission, Engineer/surveyor and owner certifications missing
- Plan type
- Preliminary/final land development plan
- Land use
- warehouse
- Zoning
- I-1 Industrial District
Project history
- 2025-10-20 · #2025-12-hickory-drive-storage-units-west-brunswi · Preliminary/final land development plan · 32,400 sq ft
Map pin is approximate.
The full picture AI research · Nov 7, 2026
The county records describe seven storage-unit buildings, about 32,400 square feet in total. They would sit on a vacant lot at 60 Hickory Drive in West Brunswick Township. The lot is zoned for industrial use. The plan also includes paving for driveways and parking, plus stormwater facilities to manage runoff.
Public water is available at the site. Sewage would be handled by an on-lot system on the property, not a public sewer.
No news coverage, township agenda or minutes, developer page, listing or business page was found for this project. Nothing online shows work started, a tenant or an opening. The county records are the only basis for this description.
What it could mean nearby
- Storage buildings usually generate little daily traffic compared with shops or homes. No traffic study was found for this site.
- The site is in an industrial-zoned area, and the county records describe the lot as vacant. Hickory Drive also has a large commercial warehouse nearby, according to county assessment records.
- The on-lot sewage system means the project would not add flow to a public sewer. Public water is available to the site.
Where it stands
The county records show a combined preliminary and final land development plan filed for review on 2025-10-20. No later approval, permit or construction was found online. Next steps usually are township and county review comments, a decision by the township supervisors, and then building and stormwater permits.
- Oct 20, 2025 Preliminary/final land development plan filed for county review
Planning terms explained
- Land development plan
- A detailed site plan showing buildings, parking, drainage and utilities that a municipality must approve before construction.
- Preliminary/final plan
- A single submission that asks for both stages of plan approval at once, instead of two separate rounds.
- Stormwater facilities
- Basins, pipes or swales that collect and slow rain runoff from paved and roofed areas.
- On-lot sewer
- A private septic or similar system on the property, used where no public sewer connects.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The West Brunswick Township supervisors normally decide land development plans after the township planning commission and county planning staff review them. Residents can usually comment at those public meetings, but no meeting notice for this project was found.
In Pennsylvania, West Brunswick Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the West Brunswick Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the West Brunswick Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find West Brunswick Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $4.2M
- ~324 roofing squares (assumes 1 story)
- ~81 tons of cooling (rule of thumb 400 sq ft/ton)