Schuylkill County · Mahanoy Township · #2024-10-hotel-lot-subdivision-and-annexation-off
Hotel lot subdivision and annexation off Morea Rd
Off Morea Rd near I-81 interchange, Mahanoy Township, PA · retail & commercial · 4.9 acres
In short: Hotel lot subdivision and annexation off Morea Rd is a retail and commercial development in Mahanoy Township, Schuylkill County, PA. The site is 4.9 acres. As of November 24, 2026, the public records we track show nothing newer since August 6, 2024. The town may have acted since.
The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.
About this project
Subdivides the hotel lot to create a 4.903-acre lot, which would be annexed to three nearby parcels. The hotel stays in place, and the proposed use is hotel and forestry. The site is zoned I manufacturing and uses public water.
County recommendation: No position
Issues raised: Waiver requests must state grounds and hardship; Note 15 must be updated or removed, Highway occupancy permit required before construction, Note 3 must reference parcel 16-10-0027.000
- Applicant
- Mountain Beauty Group LLC, Yudacot Limited Partnership
- Engineer / designer
- WJP Engineers
- Plan type
- Subdivision/annexation final plan
- Land use
- other
- Zoning
- I
Project history
- 2024-08-06 · #2024-10-hotel-lot-subdivision-and-annexation-off · Subdivision/annexation final plan
Map pin is approximate.
The full picture AI research · Nov 16, 2026
The plan reshapes land beside an existing hotel off Morea Road, near the I-81 interchange in Mahanoy Township. It carves out a 4.903-acre lot from the hotel's land. That lot would then be joined ("annexed") to three nearby parcels. No new building is described.
The county summary says the hotel stays where it is. The proposed uses are hotel and forestry. The land is zoned for manufacturing and uses public water.
The hotel at 1252 Morea Rd is listed online as a Comfort Inn & Suites with about 70 rooms. The county assessment page shows 5.81 acres, buildings dating from 2013, and a November 2024 sale to a different company. No news, developer page or township minutes about this plan were found.
What it could mean nearby
- The hotel stays in place and no new buildings are described, so traffic and noise changes look unlikely from the records alone.
- The proposed hotel and forestry uses suggest the added land would stay wooded or open rather than be built on.
- The site already uses public water, so no new utility extension is described.
Where it stands
The county planning commission reviewed the final subdivision and annexation plan on 2024-08-06. No source found shows a later approval, recording, or any work on the ground. Reviews like this are normally followed by the township's own sign-off and then recording of the new lot lines. Note: The county assessment page lists the hotel parcel's owner as a different company (sold November 2024) and its size as 5.81 acres, not the firms or acreage on the filing.
- Nov 18, 2024 County assessment page shows the hotel parcel at 1252 Morea Rd sold for $4.8 million
- Aug 6, 2024 County planning commission reviewed the final subdivision and annexation plan
Who's behind it
Mountain Beauty Group LLC · A business directory lists it as a hotel and motel company in Barnesville, PA; no official website was found.
Around the web
- Planning Commission MeetingsSchuylkill County · Aug 6, 2024Index of county planning commission meetings; it shows the 2024-08-06 review, but the linked agendas and minutes were not read.
- 1252 Morea RdSchuylkill County assessment (VGSI) · Nov 18, 2024Shows a 5.81-acre hotel parcel with 2013 buildings, owned by Keshavkrupa Motel LLC and sold in November 2024.
- Comfort Inn & Suites Barnesville - FrackvilleExpediaShows the hotel is operating at 1252 Morea Rd.
- Mountain Beauty Group, LLCNAICS ListDirectory listing of Mountain Beauty Group as a hotel and motel business in Barnesville, PA.
Planning terms explained
- Annexation
- Adding a piece of land to a neighboring parcel so the two become one property.
- Subdivision
- Dividing one piece of land into separate lots.
- Final plan
- The detailed, last-stage version of a land plan that is reviewed before approval and recording.
- Zoned I (manufacturing)
- The land is in a zone meant for industrial and manufacturing uses.
Researched by AI from public sources on Nov 16, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Mahanoy Township supervisors would handle local approval, and residents can comment at their public meetings; the county planning commission only reviews the plan.
In Pennsylvania, Mahanoy Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Mahanoy Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Mahanoy Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Mahanoy Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Subdivision and annexation, Mahanoy Townshipsame area · lot line change · Mahanoy Township · filed 2024-09-11
- Final subdivision/annexation, West End Fire Co.same area · institutional · Mahanoy City Borough · filed 2025-11-12
- Sketch plan of record, lot annexation, Mahanoy Twpsame area · lot line change · Mahanoy Township · filed 2024-07-10
- Yutko sketch plan, lot annexation III, Mahanoy Twpsame area · lot line change · Mahanoy Township · filed 2024-06-12
- Fire company final subdivision, Mahanoy Citysame area · institutional · Mahanoy City Borough · filed 2025-12-10
- Final subdivision, West End Fire and Rescue Co.same area · subdivision (use not stated) · Mahanoy City Borough · filed 2025-10-08