[Schuylkill County](https://plannednearby.com/c/schuylkill-pa/) · [Washington Township](https://plannednearby.com/c/schuylkill-pa/washington-township) · #2024-10-kurtz-solar-project-land-development-ext · [Solar farms tracker](https://plannednearby.com/topics/solar-farms/)

# Kurtz Solar Project land development extension

Washington Township, PA · other

In short: **Kurtz Solar Project land development extension** is a development project in Washington Township, Schuylkill County, PA. As of November 24, 2026, the public records we track show nothing newer since October 9, 2024. The town may have acted since.

Stage: No recent records · Latest record we have · Oct 9, 2024

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

## About this project

The county is being asked to extend its decision deadline on the Kurtz Solar Project land development plan from September 11 to October 9, 2024, so revised plans can be reviewed. The project covers tax parcels 33-11-0001.003 and 33-11-0001.004 in Washington Township.

**County recommendation:** No position

Issues raised: Extension needed to review revised land development plans

- **Applicant:** [CVE US PA Pine Grove 186 LLC](https://plannednearby.com/f/cve-north-america)
- **Engineer / designer:** [TRC Companies, Inc.](https://plannednearby.com/f/trc-companies-inc)
- **Plan type:** Preliminary/final land development (extension of decision deadline)
- **Land use:** other

## Project history

- **2024-10-09** · #2024-10-kurtz-solar-project-land-development-ext · Preliminary/final land development (extension of decision deadline)

[County plan review office →](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Map pin is approximate.

## The full picture AI research · Nov 15, 2026

CVE US PA Pine Grove 186 LLC, a solar developer's project company, has proposed a solar power facility on two tax parcels in Washington Township, Schuylkill County. The engineering firm TRC Companies is also on the filing. County records describe the project as the Kurtz Solar Project. The land is in the township's agricultural zoning district.

In October 2024 the county planning commission was asked to extend its deadline to decide on the land development plan from September 11 to October 9, 2024. The extension gave time to review revised plans.

The county's May 2026 planning commission minutes also list a Kurtz Solar final land development plan. According to a search summary of those minutes, the commission sent its inspecting engineer to inspect the site and report back in June. The minutes' text could not be read directly. No news coverage, developer project page, or construction notice was found. The size in megawatts and acres was not found, and no sign of work on the ground was found.

### What it could mean nearby

- Solar farms generate little traffic once running. Construction would bring temporary truck and worker traffic.
- The site is in an agricultural zone, so farmland or open land would likely change to a fenced solar array.
- No sources found on jobs, school effects or utility upgrades.

### Where it stands

The plan was under county review in October 2024. A county planning commission's May 2026 minutes, as summarized in search results, show a final land development plan still under review with a site inspection ordered. No approval, permit or construction was found. After county and township review, the plan would usually be approved, then state stormwater permits and local building permits would follow.

- **May 13, 2026** County planning commission minutes list the Kurtz Solar final land development plan, with a site inspection and a report due in June (per a search summary of the minutes)
- **Oct 9, 2024** County planning commission reviews the request to extend its decision deadline
- **Sep 11, 2024** Original county decision deadline, before the extension

### Who's behind it

CVE US PA Pine Grove 186 LLC · A project company that appears to belong to CVE, a community solar developer that has other Pennsylvania solar projects; this link to CVE is inferred from the naming pattern and was not confirmed.

### Around the web

- [Schuylkill County Planning Commission Minutes, May 2026](https://cms8.revize.com/revize/schuylkillcountypa/Document_Center/Agenda%20&%20minutes/Planning%20Commission%20Meetings/2026/Minutes%202026%2005.pdf) — Schuylkill County · May 13, 2026Reportedly lists the Kurtz Solar final land development plan and a site inspection ordered before a June report.
- [Planning Commission Agenda Package, October 2024](https://cms8.revize.com/revize/schuylkillcountypa/Document_Center/Agenda%20&%20minutes/Planning%20Commission%20Meetings/2024/2024%2010%20Agenda%20Package.pdf) — Schuylkill County · Oct 9, 2024Reportedly describes a solar generating facility in the agricultural zoning district of Washington Township.
- [Planning Commission Meetings](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php) — Schuylkill CountyIndex of county planning commission agendas and minutes.

Planning terms explained

- **Land development plan:** A detailed site plan showing what will be built and how it handles stormwater, access and the land.
- **Extension of decision deadline:** An agreed delay of the date by which a public body must act, often so revised plans can be reviewed.
- **Preliminary/final plan:** A combined plan submission in which the preliminary and final reviews happen together.
- **Agricultural zoning district:** A zone that mainly allows farming and related uses, with other uses allowed only under local rules.
- **Tax parcel:** A piece of land identified by number in county property records.

Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Schuylkill County Planning Commission reviews the plan at its public monthly meetings, and residents can also contact the Washington Township supervisors.

In Pennsylvania, Washington Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Washington Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Washington Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Washington Township's meeting agendas →](https://www.google.com/search?q=Washington+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Major subdivision preliminary plan ext., Washington Twp](https://plannednearby.com/x/schuylkill-major-subdivision-preliminary-plan-ext-w-963ebb) — same area · subdivision (use not stated) · Washington Township · filed 2025-05-14
- [Final land development, agricultural, Washington Twp](https://plannednearby.com/x/schuylkill-33-25-0105000) — same area · agricultural · Washington Township · filed 2026-03-11
- [Annexation plan, Washington Township](https://plannednearby.com/x/schuylkill-75) — same area · lot line change · Washington Township · filed 2026-03-11
- [Minor subdivision, Washington Township](https://plannednearby.com/x/schuylkill-minor-subdivision-washington-township-dd6ccc) — same area · lot line change · Washington Township · filed 2025-11-12
- [Solar energy facility, Washington Township](https://plannednearby.com/x/schuylkill-2026-06-solar-energy-facility-washington-townshi) — same area · other · Washington Township · filed 2026-04-01
- [Minor subdivision, Washington Township](https://plannednearby.com/x/schuylkill-33-04-0044000) — same area · subdivision (use not stated) · Washington Township · filed 2024-11-13

[See everything nearby on a map →](https://plannednearby.com/near#40.55795,-76.31164,Washington%20Township)

---

Source page: https://plannednearby.com/x/schuylkill-kurtz-solar-project-land-development-ext-ad6354

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
