Orwigsburg CSG 1 solar project land development

Orwigsburg Borough, PA · other

In short: Orwigsburg CSG 1 solar project land development is a development project in Orwigsburg Borough, Schuylkill County, PA. As of November 24, 2026, the public records we track show nothing newer since July 10, 2024. The town may have acted since.

No recent records Latest record we have · Jul 10, 2024
  1. Proposed
  2. In reviewJul 2024
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

About this project

Preliminary/final land development plan for the Orwigsburg CSG 1 LLC solar project in Orwigsburg Borough. It covers tax parcels 56-01-0012.002, 56-01-0011.000 and 56-02-0241.000. The agenda does not give capacity or acreage.

Applicant
Orwigsburg CSG 1 LLC
Plan type
Preliminary/final land development
Land use
other

Project history

  • 2024-07-10 · #2024-07-orwigsburg-csg-1-solar-project-land-deve · Preliminary/final land development

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 16, 2026

Orwigsburg CSG 1 LLC, a company tied to the Atlanta-based developer Dimension Renewable Energy, wants to build a community solar array in Orwigsburg Borough. A late-2023 local news report describes up to 3 megawatts on about 15-20 acres of a 40-acre vacant parcel behind homes on West Market Street. The county agenda does not give capacity or acreage. The three tax parcels are 56-01-0012.002, 56-01-0011.000 and 56-02-0241.000.

The borough's zoning rules bar solar in this residential area. The developer's permit application was denied in August 2023, so it asked the zoning hearing board for a special exception. About 20 residents came to the October 2023 hearing, and opinions were mixed. Concerns included stormwater, property values and noise. Some neighbors would rather see housing, and others preferred solar. The power would feed the PPL grid.

No source found shows the board's ruling, a construction start or an operating site.

What it could mean nearby

Where it stands

The county planning commission reviewed the preliminary/final land development plan on 2024-07-10. No later record, approval, permit or construction was found. After county review, the borough normally decides on the plan, and permits and construction follow.

Who's behind it

Orwigsburg CSG 1 LLC (Dimension Renewable Energy) · Dimension Renewable Energy is an Atlanta-based community solar developer, per the local news report. Other coverage ties it to community solar projects in several states, including Pennsylvania.

Around the web

Planning terms explained
Land development plan
A detailed site plan showing what will be built on a property and how it handles access and stormwater.
Special exception
Permission from the zoning hearing board for a use that the zoning rules allow only under certain conditions.
Community solar
A mid-sized solar array whose power goes to the grid and is shared among subscribers.
Preliminary/final plan
A plan submitted for both review stages at once to speed up approval.
Stormwater management
Design measures that control rain runoff so it does not flood neighbors.

Researched by AI from public sources on Nov 16, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: Orwigsburg Borough decides on the plan, and residents can comment at its public council and planning meetings listed on the borough website.

In Pennsylvania, Orwigsburg Borough decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Orwigsburg Borough's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →