Schuylkill County · Hubley Township · #2025-12-phased-solar-arrays-hubley-township · Solar farms tracker
Phased solar arrays, Hubley Township
East Main Street, west of Pine Drive, Hubley Township, PA · other
In short: Phased solar arrays, Hubley Township is a development project in Hubley Township, Schuylkill County, PA. As of November 24, 2026, it is in review. Latest record: Minor land development final plan reviewed at a meeting of the county planning commission (October 6, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
Phased solar panel structures and stormwater facilities on two existing tracts along East Main Street in Hubley Township. The tracts are vacant now and are proposed for agricultural use. The plan creates no new lots.
County recommendation: Supports, with comments
Issues raised: Highway occupancy permit needed for two driveways onto East Main Street (SR 0025), Engineer/surveyor seal and certification missing, Owner signatures and notarization missing, Two stamped copies needed for recording
- Applicant
- Triple R Farm, LLC
- Plan type
- Minor land development final plan
- Land use
- other
- Zoning
- A-Agricultural
Project history
- 2025-10-06 · #2025-12-phased-solar-arrays-hubley-township · Minor land development final plan
Map pin is approximate.
The full picture AI research · Nov 7, 2026
The plan is for phased solar panel structures and stormwater facilities on two existing tracts along East Main Street, west of Pine Drive, in Hubley Township. The landowner on the filing is Triple R Farm, LLC. The tracts are vacant now, and the county summary says they are proposed for agricultural use. The plan creates no new lots and no homes.
The county filing describes a minor land development final plan. County planners received it for review on 2025-10-06. That is the latest step in the records.
No news coverage, township meeting records, developer page, listing, permit record or construction notice was found for this site. The county facts are the only information available, so the current condition of the land is unknown.
What it could mean nearby
- Solar arrays usually generate little traffic once running. Construction could bring temporary truck and equipment trips on East Main Street.
- The plan creates no new lots or homes, so it adds no new school students or household demand for utilities.
- Stormwater facilities are part of the plan, so drainage design is a likely point of review.
Where it stands
The final plan was filed for county review on 2025-10-06, and no later approval, permit or construction was found. After review, the plan normally goes to the township for a decision, and site and stormwater permits come before any building.
- Oct 6, 2025 Minor land development final plan filed for county review
Who's behind it
Triple R Farm, LLC
Planning terms explained
- Minor land development
- A small building or site project that goes through formal plan review but does not subdivide the land into several lots.
- Final plan
- The detailed plan submitted for last review and approval before work can start.
- Stormwater facilities
- Basins, swales or similar features that collect and slow rain runoff from a site.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Hubley Township supervisors and planning commission, along with the Schuylkill County planning office, handle the plan. Residents can comment at their public meetings, but no meeting dates were found.
In Pennsylvania, Hubley Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Hubley Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Hubley Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Hubley Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Parcel A subdivision, Hubley Townshipsame area · subdivision (use not stated) · Hubley Township · filed 2025-06-11
- Minor land development final plan, Hubley Townshipsame area · other · Hubley Township · filed 2025-11-12
- Final land development, Hubley Townshipsame area · other · Hubley Township · filed 2026-03-11
- Subdivision and lot annexation, Hubleysame area · lot line change · Hubley Township · filed 2026-02-11
- Preliminary/final subdivision in Hubley Townshipsame area · subdivision (use not stated) · Hubley Township · filed 2025-03-12
- Property consolidation, Hubley Townshipsame area · lot line change · Hubley Township · filed 2024-11-13