PlannedNearby

Schuylkill County · West Penn Township · #2024-11-ridge-road-solar-sites-3-9-west-penn-tow

Ridge Road solar sites 3-9, West Penn Township

Ridge Road, West Penn Township, PA · other

In short: Ridge Road solar sites 3-9, West Penn Township is a development project in West Penn Township, Schuylkill County, PA. As of November 24, 2026, it is approved according to web research. Latest record: A Times News report from August 2025 says the township supervisors voted unanimously to conditionally approve the final plan for the 79-acre, ~33,000-panel… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved A Times News report from August 2025 says the township supervisors voted unanimously to conditionally approve the final plan for the 79-acre, ~33,000-panel Ridge Road Solar project. · web research checked Nov 14, 2026 · source AI research
  1. Proposed
  2. In reviewNov 2024
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

Preliminary land development plan by Bollinger Solar LLC for solar sites 3 through 9 on Ridge Road in West Penn Township. The agenda gives no acreage or other details.

Applicant
Bollinger Solar LLC
Plan type
Preliminary land development
Land use
other

Project history

  • 2024-11-13 · #2024-11-ridge-road-solar-sites-3-9-west-penn-tow · Preliminary land development

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 14, 2026

Bollinger Solar LLC proposed a solar farm on Ridge Road in West Penn Township, near Ash Circle. News coverage says it covers about 79 acres and would hold roughly 33,000 panels. One report describes seven linked panel fields behind an 8-foot fence. The county's 2024 agenda gave no size or details.

The township supervisors tabled the final plan in July 2025 because they wanted a plan for removing the panels at the end of their life. The developer then submitted a decommissioning agreement, a land development agreement and a stormwater agreement. The supervisors gave conditional approval to the final plan in August 2025.

No construction notice, permit record or opposition was found. The project adds no homes.

What it could mean nearby

Where it stands

The township supervisors gave conditional approval to the final plan in August 2025. Next steps usually are meeting the remaining conditions, then obtaining state stormwater and local construction permits before work begins. No source shows whether those have happened. Note: The county's 2024 agenda gave no size or details, but later news coverage reports 79 acres and about 33,000 panels, and one search summary put the supervisors' tabling vote and final-plan approval in 2024 while the dated article places them in 2025.

Who's behind it

Bollinger Solar LLC · A solar developer named in news coverage for projects in West Penn Township, Franklin Township (about 9 acres, conditionally approved in August 2024) and Towamensing Township (zoning board denial in September 2025).

Around the web

Planning terms explained
Land development plan
A detailed site plan showing what will be built and how it meets local rules.
Conditional approval
Approval that depends on the developer meeting listed requirements.
Decommissioning plan
A plan for removing the solar panels and restoring the land when the project ends.
Stormwater agreement
A commitment to manage rain runoff from the site so it doesn't harm neighbors or streams.

Researched by AI from public sources on Nov 14, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The West Penn Township supervisors decide township-level matters and meet publicly, so residents can comment at their meetings or through the township office.

In Pennsylvania, West Penn Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find West Penn Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →