Schuylkill County · Washington Township · #2024-11-solar-energy-facility-washington-townshi · Solar farms tracker
Solar energy facility, Washington Township
Two parcels (UPI 33-11-0001.003 and 33-11-0001.004), access from T-645, Washington Township, PA · other
In short: Solar energy facility, Washington Township is a development project in Washington Township, Schuylkill County, PA. As of November 24, 2026, the public records we track show nothing newer since November 13, 2024. The town may have acted since.
The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.
About this project
Proposed solar energy generating facility on two separately owned parcels in the Agricultural zone, with a 25-foot vegetative buffer on the south, west and north sides. Reviewers say the plan can be considered for preliminary approval.
County recommendation: Supports, with comments
Issues raised: Erosion and sediment control and stormwater (PCSM) approvals from the conservation district and DEP are needed before final approval, Full E&S and PCSM plan sets must be included with the final plan, The landscape planting template referenced on the plan is not shown, Washington Township may require a driveway permit for T-645, Final plan sheets must be numbered consecutively for recording
- Applicant
- CVE North America
- Engineer / designer
- TRC (Dickson City, PA)
- Plan type
- Preliminary land development plan
- Land use
- other
- Zoning
- Agricultural
Project history
- 2024-11-13 · #2024-11-solar-energy-facility-washington-townshi · Preliminary land development plan
Map pin is approximate.
The full picture AI research · Nov 13, 2026
A solar power generating facility is proposed on two separately owned parcels in Washington Township, Schuylkill County. Both are zoned Agricultural, and access would come from township road T-645. The plan includes a 25-foot planted buffer along the south, west and north sides.
The filing names CVE North America and the engineering firm TRC. The county planning commission looked at the preliminary land development plan on 2024-11-13. Reviewers said it could be considered for preliminary approval. County records in the material reviewed do not give the project's size in acres or megawatts, and do not give the owners.
Searches found no news coverage, township minutes, developer project page, permit record or sign of construction for this site. What stands on the parcels today is not confirmed. The county records suggest farmland or open land.
What it could mean nearby
- Access would be from township road T-645, so any construction traffic would use that road.
- A 25-foot vegetative buffer on three sides is meant to soften the view from neighboring properties.
- The land is zoned Agricultural, so the project would change how that land is used. Whether the farmland would be taken out of production is not stated.
Where it stands
The plan is in review. The county planning commission's last recorded step was on 2024-11-13, when reviewers said it could be considered for preliminary approval. The township supervisors usually decide on the land development plan next. Final plan approval and construction permits would follow.
- Nov 13, 2024 County planning commission reviewed the preliminary land development plan
Who's behind it
CVE North America · A developer of solar and battery storage projects; its other work includes a solar and storage project in New York State.
Around the web
- Planning Commission MeetingsSchuylkill CountyThe county's list of planning commission meetings, which is where the 2024-11-13 review is recorded. The page text itself did not mention this project.
Planning terms explained
- Preliminary land development plan
- A detailed first-round site plan that local officials review before a final plan is approved and building begins.
- County planning commission
- A county body that gives advice on local development plans. The township makes the final decision.
- Agricultural zone
- A zoning district meant mainly for farming and low-density uses.
- Vegetative buffer
- A strip of trees or plants planted to screen a project from neighbors.
- UPI
- The county's Uniform Parcel Identifier, a number that identifies a specific property.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 13, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: Washington Township's governing body normally decides land development plans, and residents can usually comment at its public meetings. The township office can confirm meeting dates, since no agenda was found online.
In Pennsylvania, Washington Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Washington Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Washington Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Washington Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Solar project land development, Washington Townshipsame area · other · Washington Township · filed 2024-10-09
- Minor subdivision, Washington Twp (E&S waiver)same area · subdivision (use not stated) · Washington Township · filed 2025-12-10
- Agricultural operation plan, Washington Townshipsame area · agricultural · Washington Township · filed 2026-08-12
- Major subdivision, Washington Townshipsame area · subdivision (use not stated) · Washington Township · filed 2025-02-12
- Minor subdivision, Washington Townshipsame area · subdivision (use not stated) · Washington Township · filed 2025-02-12
- Minor subdivision, Washington Townshipsame area · lot line change · Washington Township · filed 2025-06-11