Solar facility on Clarks Valley Road, Porter Township
Clarks Valley Road (SR 0325), Porter Township, Porter Township, PA · other · 40.0 acres
In short: Solar facility on Clarks Valley Road, Porter Township is a development project at Clarks Valley Road (SR 0325) in Porter Township, Schuylkill County, PA. The site is 40.0 acres. As of November 24, 2026, the public records we track show nothing newer since August 7, 2024. The town may have acted since.
The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.
About this project
Solar energy facility on two lease areas of 7.235 and 5.446 acres within a 39.95-acre Agricultural parcel. Staff recommends denial because the plan was submitted as a final plan without the required preliminary-plan content.
County recommendation: Opposes
Issues raised: Plan must be relabeled and submitted under the preliminary plan requirements, Boundary survey of the entire tract is missing; only partial boundaries are shown, No access is shown between the two lease areas, Lease Area 2 extends to the centerline of SR 0325; a legal interpretation is needed, A PennDOT highway occupancy permit is required for final approval
- Engineer / designer
- Burget & Associates
- Plan type
- Final land development plan (staff recommends denial)
- Land use
- other
- Zoning
- Agricultural
Project history
- 2024-08-07 · #2024-11-solar-facility-on-clarks-valley-road-por · Final land development plan (staff recommends denial)
Map pin is approximate.
The full picture AI research · Nov 18, 2026
A solar energy facility is proposed on Clarks Valley Road (SR 0325) in Porter Township, Schuylkill County. County records describe two lease areas of about 7.2 and 5.4 acres. They sit inside a 39.95-acre parcel zoned for agriculture. The records don't say how much power it would produce or who would operate it.
The plan went to the county planning commission as a final plan. County staff recommended denial because it lacked the content normally required in an earlier preliminary plan. The county's meetings page dates that meeting Aug. 14, 2024, not Aug. 7.
No news coverage, developer page, township agenda, permit record or sign of construction was found for this site. The county's minutes were fetched but could not be read. The commission's vote and the plan's current status are therefore unconfirmed.
What it could mean nearby
- Most of the 39.95-acre parcel would stay open, because only about 12.7 acres are in the two lease areas.
- Solar facilities typically generate little traffic once built. Construction traffic on Clarks Valley Road, a state route, is possible, but no source describes this plan's traffic.
- No homes, schools or utilities impacts are described in the records.
Where it stands
The latest record is the county planning commission's review of a final plan, with staff recommending denial. No later decision, approval or permit was found, so the outcome is unconfirmed. A plan that is incomplete as submitted usually has to be resubmitted with the missing preliminary-plan material, or it is denied or withdrawn. Note: The page dates the meeting Aug. 7, 2024, but the county's meetings listing shows the August 2024 regular meeting on 08/14/24.
- Aug 14, 2024 County planning commission regular meeting at which the plan was on the August 2024 agenda; staff recommended denial
Who's behind it
Burget & Associates · Named on the county filing, probably as the engineering or surveying firm for the plan. The solar developer and the landowner are not identified in the records found.
Around the web
- Planning Commission MeetingsSchuylkill County · Aug 14, 2024Lists the August 2024 regular meeting as 08/14/24, with links to its agenda and minutes.
Planning terms explained
- Final land development plan
- The detailed site plan a municipality approves before construction can begin.
- Preliminary plan
- An earlier, less detailed plan stage that a project normally goes through before the final plan.
- Lease area
- The part of a larger property that the landowner rents to the solar company.
- County planning commission
- A county board that reviews local plans and advises the township. It does not usually make the final decision.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 18, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Porter Township supervisors, who normally decide land development plans after the county commission's review, and the county planning commission meet publicly. Residents can comment at those meetings or through the township and county planning offices.
In Pennsylvania, Porter Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Porter Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Porter Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Porter Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Lot addition, Porter Townshipsame area · lot line change · Porter Township · filed 2026-03-11
- Land development, Porter Townshipsame area · other · Porter Township · filed 2025-02-12
- Major land development final plan, Porter Townshipsame area · other · Porter Township · filed 2025-10-08
- 4-parcel final lot annexation, Porter Townshipsame area · lot line change · Porter Township · filed 2024-03-13
- 2-lot minor subdivision on 32 VPT Roadsame area · single-family homes · Porter Township · filed 2026-05-13
- Solar energy facility, Porter Townshipsame area · other · Porter Township · filed 2026-02-11