Schuylkill County · West Mahanoy Township; Ryan Township · #2024-07-south-morea-solar-project-land-developme · Solar farms tracker
South Morea Solar Project land development
West Mahanoy Township; Ryan Township, PA · other
In short: South Morea Solar Project land development is a development project in West Mahanoy Township; Ryan Township, Schuylkill County, PA. As of November 24, 2026, it is approved according to web research. Latest record: The Shenandoah Sentinel reported on March 19, 2024 that the West Mahanoy planning commission and supervisors conditionally approved JMB Limited's solar land… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.
Usually next: building and stormwater permits; site work often starts within 3 to 12 months.
About this project
Preliminary/final land development plan for the South Morea Solar Project, spanning West Mahanoy and Ryan townships. It covers tax parcels 36-06-0019.000 and 26-06-0018.000 and is submitted by JMB LTD.
- Applicant
- JMB LTD
- Plan type
- Preliminary/final land development
- Land use
- other
Project history
- 2024-07-10 · #2024-07-south-morea-solar-project-land-developme · Preliminary/final land development
Map pin is approximate.
The full picture AI research · Nov 16, 2026
The South Morea Solar Project is a small solar farm proposed by JMB LTD on former mining land near Morea, off Eleanor Road and about 400 feet north of Interstate 81. County records list it on two parcels that cross the West Mahanoy and Ryan township line. The power would be sold to the local utility.
Local news describes a West Mahanoy solar plan by JMB, a sister company of Reading Anthracite. It covers about 11 acres, with panels on roughly 4.5 acres and about 6,000 panels in all. The panels would face south and have no buildings, and topography and vegetation would screen them. The zoning board approved a variance in October 2023. The planning commission and township supervisors gave conditional approval in March 2024.
The news stories don't mention Ryan Township. They also don't say whether they cover the same plan as the county filing. No source shows construction or operation.
What it could mean nearby
- Panels would sit on former mine land near I-81 and face the interstate, with screening from terrain and vegetation.
- The site would have no buildings, and the zoning board required a 10-foot security fence and fire department access.
- A bond for removing the panels at the end of their life was required as a condition of the zoning approval.
- In September 2026 West Mahanoy paused new solar farm and data center proposals for about six months. The report doesn't mention this project.
Where it stands
The county planning commission reviewed the preliminary/final land development plan in July 2024, and the latest news shows conditional township approval in March 2024 for what appears to be the West Mahanoy part. Next steps would normally be meeting the approval conditions, getting erosion-control and other permits, and then building, but no source shows that happening. Note: The news stories describe an 11-acre project in West Mahanoy alone and don't mention Ryan Township, while the county filing spans both townships, so they may describe an earlier or different version of the plan.
- Sep 15, 2026 West Mahanoy supervisors paused new solar farm and data center proposals for 180 days
- Jul 10, 2024 Latest county filing: preliminary/final land development reviewed by the county planning commission
- Mar 19, 2024 West Mahanoy planning commission and supervisors gave conditional approval to JMB's solar plan
- Oct 12, 2023 Zoning hearing scheduled for JMB's 11-acre solar proposal
- Oct 2023 West Mahanoy zoning hearing board approved a variance with three conditions
Who's behind it
JMB LTD (JMB Limited) · A sister company of Reading Anthracite, a Pottsville-based company that owns former mining land in Schuylkill County and is pursuing solar projects on it.
Around the web
- West Mahanoy planners give Reading Anthracite solar farm conditional green lightThe Shenandoah Sentinel · Mar 19, 2024The planning commission and supervisors conditionally approved JMB's solar plan near Morea, with conditions.
- Reading Anthracite gets first solar farm approvedThe Shenandoah Sentinel · Oct 16, 2023The zoning board approved JMB's variance for an 11-acre, roughly 6,000-panel solar farm with three conditions.
- Reading Anthracite solar farm hearing postponed in Foster; affiliate seeking approval in West MahanoyThe Shenandoah Sentinel · Oct 4, 2023JMB proposed an 11-acre solar farm near Morea Road, selling power to a utility, and set a zoning hearing for Oct. 12.
- West Mahanoy invokes six month moratorium on data centers, solar farms, mulls regulationsThe Shenandoah Sentinel · Sep 15, 2026West Mahanoy paused new solar and data center proposals, and the report says no solar application had been filed then.
- Planning Commission MeetingsSchuylkill County · Jul 15, 2024Lists the July 2024 county planning commission meeting where the filing was reviewed.
Planning terms explained
- Land development plan
- A detailed site plan showing what will be built on a property and how it meets local rules.
- Variance
- Special permission from a zoning board to depart from a zoning rule because of a site's unusual conditions.
- Conditional approval
- Approval that depends on the applicant meeting a list of requirements.
- Decommissioning
- Removing the equipment and restoring the site when a facility stops operating.
- Erosion control plan
- A plan showing how soil and runoff will be kept from washing off the site during construction.
Researched by AI from public sources on Nov 16, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The West Mahanoy and Ryan township supervisors and planning commissions handle local approvals, and the public can comment at their regular meetings, which are listed on each township's page.
In Pennsylvania, West Mahanoy Township; Ryan Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the West Mahanoy Township; Ryan Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the West Mahanoy Township; Ryan Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find West Mahanoy Township; Ryan Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →