[Schuylkill County](https://plannednearby.com/c/schuylkill-pa/) · [West Brunswick Township](https://plannednearby.com/c/schuylkill-pa/west-brunswick-township) · #2024-02-wellspring-manor-2-lot-commercial-subdiv

# Wellspring Manor 2-lot commercial subdivision

Near Centre Tpke (SR 61) and Brick Hill Rd, West Brunswick Township, PA · retail & commercial

In short: **Wellspring Manor 2-lot commercial subdivision** is a retail and commercial development in West Brunswick Township, Schuylkill County, PA. As of November 24, 2026, the public records we track show nothing newer since January 3, 2024. The town may have acted since.

Stage: No recent records · Latest record we have · Jan 3, 2024

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

## About this project

Creates two new commercial lots fronting Centre Turnpike (SR 61), mostly in the C-1 district, on vacant land. It also leaves a flag-shaped residual lot that uses an existing driveway. No land development is proposed at this time.

**County recommendation:** Supports, with comments

Issues raised: Waiver requests from SALDO need stated grounds per MPC Sec. 512.1, Owner and professional signatures, seal and notarization missing, Evidence needed that water and sewer providers can serve the connections, Access to new commercial lots from SR 61 unclear; HOP note needed (Sec. 508.6)

- **Applicant:** Residual Trust of Andrew Yastishok
- **Engineer / designer:** [Arro Engineering](https://plannednearby.com/f/arro-consulting)
- **Plan type:** Preliminary/final subdivision
- **Land use:** other
- **Zoning:** C-1 and R-2

## Project history

- **2024-01-03** · #2024-02-wellspring-manor-2-lot-commercial-subdiv · Preliminary/final subdivision

[County plan review office →](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php)

Map pin is approximate.

## The full picture AI research · Nov 18, 2026

County records describe a plan to split vacant land along Centre Turnpike (Route 61), near Brick Hill Road in West Brunswick Township, into two new commercial lots. Most of the land is in the township's C-1 commercial zoning district. The plan also leaves a flag-shaped leftover lot behind the new lots. That lot keeps using an existing driveway.

The plan only divides the land. It does not propose any buildings, parking lots or other construction. Whoever buys or develops the lots would need to submit a separate development plan later.

No news coverage, developer page, township agenda, listing or opening notice was found for this project. Nothing online shows a named tenant, construction or a sale.

### What it could mean nearby

- Two new lots fronting a state highway could eventually bring new businesses and driveways onto Route 61, but no use has been proposed yet.
- Because no buildings are proposed now, the plan itself adds no traffic, jobs or utility demand.
- The leftover lot keeps its existing driveway, so access for it should not change.

### Where it stands

The county planning commission reviewed a combined preliminary and final subdivision plan on 2024-01-03, and no later records were found. If the plan is approved and recorded, any actual building would need a separate land development plan and permits.

- **Jan 3, 2024** County planning commission reviewed the preliminary/final subdivision plan

### Who's behind it

Residual Trust of Andrew Yastishok · The filing names this trust as the landowner or applicant and Arro Engineering as the engineering firm. No company website or other projects were found.

### Around the web

- [Planning Commission Meetings](https://www.schuylkillcountypa.gov/departments/planning___zoning/planning_commission_meetings.php) — Schuylkill CountyLists the county planning commission meetings, including the January 2024 meeting where this plan was reviewed. The page text did not name the project or give any details about it.

Planning terms explained

- **Subdivision:** Dividing one piece of land into two or more separate lots.
- **Preliminary/final plan:** A combined review in which the first and last approval steps are handled together.
- **C-1 district:** A commercial zoning area in the township, where shops and similar businesses are typically allowed.
- **Flag-shaped lot:** A lot with a narrow strip reaching the road and a wider area behind, like a flag on a pole.
- **Land development:** Planning to build on a lot, such as buildings, parking and drainage, which is reviewed separately from a subdivision.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 18, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The West Brunswick Township supervisors, who usually decide on subdivisions, hold public meetings where residents can comment. Contact the township office for agendas and dates.

In Pennsylvania, West Brunswick Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the West Brunswick Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the West Brunswick Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find West Brunswick Township's meeting agendas →](https://www.google.com/search?q=West+Brunswick+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Ernst Partnership annexation, West Brunswick](https://plannednearby.com/x/schuylkill-ernst-partnership-annexation-west-brunsw-fbe986) — same area · lot line change · West Brunswick Township · filed 2025-12-18
- [Annexation plan, West Brunswick Township](https://plannednearby.com/x/schuylkill-35-08-005000135-08-005000235-08-005000342-02-000100042-05-0001000) — same area · lot line change · West Brunswick Township · filed 2025-02-12
- [Final land development at 1284 Centre Turnpike](https://plannednearby.com/x/schuylkill-final-land-development-at-1284-centre-tu-9e298a) — same area · other · West Brunswick Township · filed 2025-03-12
- [Hunter's View subdivision, West Brunswick Twp](https://plannednearby.com/x/schuylkill-35-08-0124000) — same area · subdivision (use not stated) · West Brunswick Township · filed 2026-10-14
- [Geisinger MOB building expansion sketch plan](https://plannednearby.com/x/schuylkill-2026-08-geisinger-mob-building-expansion-sketch) — same area · office · West Brunswick Township · filed 2026-08-12
- [Hunter's View preliminary subdivision, West Brunswick](https://plannednearby.com/x/schuylkill-2025-02-hunter-s-view-preliminary-subdivision-we) — same area · subdivision (use not stated) · West Brunswick Township · filed 2025-02-12

[See everything nearby on a map →](https://plannednearby.com/near#40.61953,-76.08734,West%20Brunswick%20Township)

---

Source page: https://plannednearby.com/x/schuylkill-wellspring-manor-2-lot-commercial-subdiv-f11f15

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
